共 50 条
- [21] Probabilistic estimation of the advancement rate of the Tunnel Boring Machines on the basis of rock mass characteristics Geomechanics and Geophysics for Geo-Energy and Geo-Resources, 2022, 8
- [23] TUNNEL ADVANCE RATE PREDICTION BASED ON GEOLOGIC AND ENGINEERING OBSERVATIONS INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 1971, 8 (05): : 451 - &
- [24] A new model for predicting the advance rate of a Tunnel Boring Machine (TBM) in hard rock conditions RUDARSKO-GEOLOSKO-NAFTNI ZBORNIK, 2020, 35 (02): : 57 - 74
- [26] Application of artificial neural networks to the prediction of tunnel boring machine penetration rate Mining Science and Technology, 2010, 20 (05): : 727 - 733
- [27] Supervised Machine Learning Techniques to the Prediction of Tunnel Boring Machine Penetration Rate APPLIED SCIENCES-BASEL, 2019, 9 (18):
- [28] Simulation of tunnel boring machine utilization: A case study JOURNAL OF MINING AND ENVIRONMENT, 2018, 9 (01): : 53 - 60