Synchronized Two-Stage Lot Sizing and Scheduling Problem in Automotive Industry

被引:0
|
作者
Uney-Yuksektepe, Fadime [1 ]
Ozdemir, Rifat Gurcan [1 ]
机构
[1] Istanbul Kultur Univ, Dept Ind Engn, Istanbul, Turkey
关键词
D O I
10.1007/978-3-642-29210-1_76
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This study proposes a mixed-integer linear programming model to solve the synchronized two-stage lot sizing and scheduling problem with setup times and costs. The main motivation behind this study is based on the need of improvement in the inventory control and management system of a supplier that serves to automotive industry. The supplier considered in this study has synchronized two-stage production system which involves three parallel injection machines in the first stage and a single spray dying station in the second stage. In order to achieve synchronization of the production between these stages and improve the inventory levels, a mixed-integer linear programming model is proposed. By the help of developed model, synchronization between the parallel injection machines and the single spray dying station with minimum total cost is obtained. Optimal lot sizes for each stage and optimal schedules of these lot sizes are determined by the developed model as well.
引用
收藏
页码:477 / 482
页数:6
相关论文
共 50 条
  • [41] A discrete PSO for two-stage assembly scheduling problem
    Tian, Ye
    Liu, Dayou
    Yuan, Donghui
    Wang, Kunhao
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (1-4): : 481 - 499
  • [42] A discrete PSO for two-stage assembly scheduling problem
    Ye Tian
    Dayou Liu
    Donghui Yuan
    Kunhao Wang
    The International Journal of Advanced Manufacturing Technology, 2013, 66 : 481 - 499
  • [43] Solving the spatial scheduling problem: a two-stage approach
    Zhang, Zhiying
    Chen, Jie
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (10) : 2732 - 2743
  • [44] Power system state scheduling with the two-stage problem
    Palamarchuk, SI
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (02) : 439 - 445
  • [45] Optimal lot-sizing in a two-stage system with auto-correlated arrivals
    Enns, ST
    Zhu, P
    PROCEEDINGS OF THE 2005 WINTER SIMULATION CONFERENCE, VOLS 1-4, 2005, : 1705 - 1711
  • [46] Impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop
    Tokyo Metropolitan Inst of, Technology, Tokyo, Japan
    Int J Prod Res, 11 (3037-3053):
  • [47] A Two-Stage Multi-Objective Genetic Algorithm for a Flexible Job Shop Scheduling Problem with Lot Streaming
    Rooyani, Danial
    Defersha, Fantahun
    ALGORITHMS, 2022, 15 (07)
  • [48] The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop
    Tsubone, H
    Ohba, M
    Uetake, T
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (11) : 3037 - 3053
  • [49] A Two-Stage Stochastic Programming Approach for Energy-Oriented Lot-Sizing
    Liao, Ruiwen
    Quezada, Franco
    Gicquel, Celine
    Kedad-Sidhoum, Safia
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS-PRODUCTION MANAGEMENT SYSTEMS FOR VOLATILE, UNCERTAIN, COMPLEX, AND AMBIGUOUS ENVIRONMENTS, APMS 2024, PT III, 2024, 730 : 348 - 363
  • [50] A matheuristic approach for solving a simultaneous lot sizing and scheduling problem with client prioritization in tire industry
    Koch, Cyril
    Arbaoui, Taha
    Ouazene, Yassine
    Yalaoui, Farouk
    De Brunier, Humbert
    Jaunet, Nicolas
    De Wulf, Antoine
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 165