共 50 条
- [29] Bicriteria in a two-stage flowshop scheduling problem INDIAN JOURNAL OF PURE & APPLIED MATHEMATICS, 2000, 31 (11): : 1475 - 1481
- [30] Capacitated Lot-Sizing and Scheduling Problem for Second-Tier Suppliers in the Automotive Sector CLOSING THE GAP BETWEEN PRACTICE AND RESEARCH IN INDUSTRIAL ENGINEERING, 2018, : 121 - 129