Projects Feasibility Assessment Model Based on Competencies in Organization

被引:0
|
作者
Kajdanowicz, Tomasz [1 ]
Fraczkowski, Kazimierz [1 ]
机构
[1] Wroclaw Univ Technol, Fac Comp Sci & Management, Wroclaw, Poland
来源
INFORMATICS ENGINEERING AND INFORMATION SCIENCE, PT I | 2011年 / 251卷
关键词
staff scheduling; multiple criteria analysis; project planning; competence scheduling model; HEURISTICS;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A proposal for modelling the human resource planning among projects is presented in the paper. The situation when a set of projects is expected to be accomplished in the organization is considered. The presented model provides the answer whether within available human resources with given competencies it is possible to accomplish a set of projects. Moreover the model is able to propose optimized staffing solution given objective function,e.g. maximizing the increase of competencies of the staff. Modelling is based on quantitative description of tasks and employees. The paper presents a case study of model utilization. The preliminary studies on the proposed model allow to conclude that the it reflects the nature of staffing process well.
引用
收藏
页码:529 / +
页数:3
相关论文
共 50 条
  • [41] Role of Remote Sensing Inputs in Feasibility Assessment of Proposed Irrigation Projects
    Rao, B. Simhadri
    Shanker, M.
    Rao, V. Venkateswar
    JOURNAL OF THE INDIAN SOCIETY OF REMOTE SENSING, 2012, 40 (03) : 447 - 456
  • [42] LIFE SATISFACTION - A STUDY BASED ON THE ORGANIZATION OF PERSONAL PROJECTS
    YETIM, U
    SOCIAL INDICATORS RESEARCH, 1993, 29 (03) : 277 - 289
  • [43] A Constructability Assessment Model Based on BIM in Urban Renewal Projects in Limited Lands
    Faraji, Amir
    Arya, Shima Homayoon
    Ghasemi, Elnaz
    Soleimani, Hossein
    Rahnamayiezekavat, Payam
    BUILDINGS, 2023, 13 (10)
  • [44] Assessment of operation safety resilience of water conservancy projects based on cloud model
    Song L.
    Zhang J.
    Du J.
    Jian Y.
    Shen J.
    Li H.
    Water Resources Protection, 2023, 39 (02) : 208 - 214
  • [45] A feasibility study on impact assessment of development projects in straits and basin system
    Shen, YY
    Nakatsuji, K
    PROCEEDINGS OF THE FIRST ASIAN AND PACIFIC COASTAL ENGINEERING CONFERENCE, VOLS 1 AND 2 (APACE 2001), 2001, : 451 - 460
  • [46] A DYNAMIC SIMULATION MODEL FOR ECONOMIC FEASIBILITY OF APARTMENT DEVELOPMENT PROJECTS
    Lee, Kwangchae
    Son, Seunghyun
    Kim, Doyeong
    Kim, Sunkuk
    INTERNATIONAL JOURNAL OF STRATEGIC PROPERTY MANAGEMENT, 2019, 23 (05) : 305 - 316
  • [47] Competencies and Their Assessment
    Drisko, James W.
    JOURNAL OF SOCIAL WORK EDUCATION, 2014, 50 (03) : 414 - 426
  • [48] Assessment of competencies
    Leutner, Detlev
    Klieme, Eckhard
    ZEITSCHRIFT FUR PSYCHOLOGIE-JOURNAL OF PSYCHOLOGY, 2008, 216 (02): : 60 - 60
  • [49] Feasibility assessment of the service delivery model
    Coll, KM
    Mohatt, G
    LeMaster, PL
    AMERICAN INDIAN AND ALASKA NATIVE MENTAL HEALTH RESEARCH, 2004, 11 (02) : 99 - 108
  • [50] Ontology based communications through model driven tools:Feasibility of the MDA approach in urban engineering projects
    Grangel, R.
    Metral, C.
    Cutting-Decelle, A. F.
    Bourey, J. P.
    Young, R. I. M.
    ONTOLOGIES FOR URBAN DEVELOPMENT, 2007, 61 : 181 - +