Projects Feasibility Assessment Model Based on Competencies in Organization

被引:0
|
作者
Kajdanowicz, Tomasz [1 ]
Fraczkowski, Kazimierz [1 ]
机构
[1] Wroclaw Univ Technol, Fac Comp Sci & Management, Wroclaw, Poland
来源
INFORMATICS ENGINEERING AND INFORMATION SCIENCE, PT I | 2011年 / 251卷
关键词
staff scheduling; multiple criteria analysis; project planning; competence scheduling model; HEURISTICS;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A proposal for modelling the human resource planning among projects is presented in the paper. The situation when a set of projects is expected to be accomplished in the organization is considered. The presented model provides the answer whether within available human resources with given competencies it is possible to accomplish a set of projects. Moreover the model is able to propose optimized staffing solution given objective function,e.g. maximizing the increase of competencies of the staff. Modelling is based on quantitative description of tasks and employees. The paper presents a case study of model utilization. The preliminary studies on the proposed model allow to conclude that the it reflects the nature of staffing process well.
引用
收藏
页码:529 / +
页数:3
相关论文
共 50 条
  • [31] Feasibility Analysis of GGDP System Based on Climate Impact Assessment Model
    Xiao Xinyuan
    Han, Liu
    Zhang Haowei
    Tang Jiuyang
    Wang Xianrui
    NEW DEVELOPMENTS IN ENVIRONMENTAL SCIENCE AND ENGINEERING, ICESE 2023, 2024, : 21 - 38
  • [32] THE MODEL OF INTERMEDIATE ASSESSMENT OF FUTURE TEACHERS' PROFESSIONAL COMPETENCIES
    Golovina, Inna, V
    Khaladov, Khozh-Akhmed S.
    Medvedeva, Tatiana Y.
    Paputkova, Galina A.
    Milekhin, Andrey, V
    OBRAZOVANIE I NAUKA-EDUCATION AND SCIENCE, 2024, 26 (04): : 46 - 67
  • [33] DEFINITION OF KEY COMPETENCIES OF THE ORGANIZATION
    Rodyn, D., V
    MORDOVIA UNIVERSITY BULLETIN, 2009, 3 : 116 - 119
  • [34] Essential competencies for technochange management: Towards an assessment model
    Harison, Elad
    Boonstra, Albert
    INTERNATIONAL JOURNAL OF INFORMATION MANAGEMENT, 2009, 29 (04) : 283 - 294
  • [35] Competencies for Managing Activities in Agile Projects
    da Costa Filho J.R.
    Penha R.
    da Silva L.F.
    Bizarrias F.S.
    Global Journal of Flexible Systems Management, 2022, 23 (4) : 431 - 452
  • [36] The Assessment of the Entropy Production in Organization Based on Proposed Entropy Management Model
    Brohi, Ali Anwar
    Zhang, Hao-Chun
    Ibrar, Muhammad
    Brohi, Ali Jan
    Naeem, Kamran
    VISION 2020: SUSTAINABLE ECONOMIC DEVELOPMENT AND APPLICATION OF INNOVATION MANAGEMENT, 2018, : 8420 - 8423
  • [37] Risk Assessment of Water Environment Treatment PPP Projects Based on a Cloud Model
    Zhang, Yaqiong
    He, Nan
    Li, Yijing
    Chen, Yiyang
    Wang, Lei
    Ran, Yunlong
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2021, 2021
  • [38] Role of Remote Sensing Inputs in Feasibility Assessment of Proposed Irrigation Projects
    B. Simhadri Rao
    M. Shanker
    V. Venkateswar Rao
    Journal of the Indian Society of Remote Sensing, 2012, 40 : 447 - 456
  • [39] Pre-feasibility Assessment of Small Hydropower Projects in Turkey by RETScreen
    Yuce, M. Ishak
    Yuce, Simal
    JOURNAL AMERICAN WATER WORKS ASSOCIATION, 2016, 108 (05): : E269 - E275
  • [40] Pre-feasibility assessment of small hydropowen projects in Turkey by RETScreen
    1600, American Water Works Association (108):