Research on the risk assessment method of PPP project based on the improved matter element model

被引:8
|
作者
Liu, B. [1 ]
Sun, F-H [2 ]
机构
[1] Nanjing Forestry Univ, Sch Civil Engn, Dept Engn Management, Nanjing, Peoples R China
[2] Hohai Univ, Sch Business, Dept Accounting, Nanjing, Peoples R China
基金
中国国家自然科学基金;
关键词
PPP project risk management; Risk assessment; Risk identification; Improved matter element model; Index system; PUBLIC-PRIVATE PARTNERSHIPS; MANAGEMENT;
D O I
10.24200/sci.2018.5295.1187
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
When identifying (Public-Private-Partnership) PPP project risks using the decomposition analysis method, the PPP project risks are considered to include government risk, market risk, and project risk. Based on these facts, a constructed list of PPP project risks is established, which can be divided into three first-class indexes and 27 second-class indexes. Based on the analysis of the traditional matter element model limitations, the evaluation model of PPP project risk assessment of the improved matter element model is established in order to provide effective support, for effective PPP project risk management, contract management, and other work. Lastly, the feasibility of theoretical research is verified by a case study. (C) 2020 Sharif University of Technology. All rights reserved.
引用
收藏
页码:614 / 624
页数:11
相关论文
共 50 条
  • [31] Assessment method of urban green transportation development level based on improved matter-element extension method
    Wang, Yuhua
    Li, Aizeng
    Jiao, Shuaiyang
    Wang, Yiwen
    International Journal of Sustainable Development, 2024, 27 (03) : 339 - 354
  • [32] A Novel Hybrid Evaluation Model for the Performance of ERP Project Based on ANP and Improved Matter-Element Extension Model
    Zhao Hui-ru
    Li Na-na
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [33] Eutrophication Assessment Based on the Cloud Matter Element Model
    Wang, Yumin
    Zhang, Xian'e
    Wu, Yifeng
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2020, 17 (01)
  • [34] Risk Analysis of Affordable Housing Project Based on PPP Financing Model
    Cheng, Xiaoye
    Cai, Wenwen
    PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2012, : 508 - 512
  • [35] STUDY ON RISK EVALUATION MODEL OF PPP PROJECT BASED ON VAGUE VALUE
    Hu, Li
    Zhang, Weiguo
    Lou, Tingting
    PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON SUSTAINABLE URBANIZATION (ICSU 2010), 2010, : 361 - 369
  • [36] Research on Enterprise Credit Risk Assessment Method Based on Improved Genetic Algorithm
    Li Jinjuan
    PROCEEDINGS OF 2017 9TH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA), 2017, : 215 - 218
  • [37] Project Logistics Risk Evaluation Based on Matter-element Analysis
    Song, Ti
    Wei, Lian-yu
    Zhang, Cai-li
    Chen, Pei
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2820 - 2824
  • [38] Study on the Comprehensive Assessment of Controlling Efficiency of Engineering Project Based on Matter-element and GAHP Model
    Liu Bo
    Shen Ju-qin
    Xu Gao-yan
    Tang Liang
    Xu Zi-lin
    Sun Fu-hua
    Bao Li-rong
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING III, PT 1, 2014, 638-640 : 2446 - +
  • [39] Private College's Education Risk Assessment and Early Warning Mechanism Research Based on the Extension Matter-Element Model
    Wang, Dongling
    2015 2ND INTERNATIONAL CONFERENCE ON CREATIVE EDUCATION (ICCE 2015), PT 1, 2015, 10 : 413 - 418
  • [40] Risk Assessment of Mining Heritage Reuse in Public-Private-Partnership Mode Based on Improved Matter-Element Extension Model
    Yang, Shan
    Zhuo, Shengyuan
    Xu, Zitong
    Chen, Jianhong
    MATHEMATICS, 2023, 11 (16)