Scheduling unrelated parallel batch processing machines with non-identical job sizes and unequal ready times

被引:68
|
作者
Arroyo, Jose Elias C. [1 ]
Leung, Joseph Y. -T. [2 ,3 ]
机构
[1] Univ Fed Vicosa, Dept Comp Sci, BR-36570900 Vicosa, MG, Brazil
[2] Hefei Univ Technol, Sch Management, Hefei 230009, Anhui, Peoples R China
[3] New Jersey Inst Technol, Dept Comp Sci, Newark, NJ 07102 USA
关键词
Scheduling; Unrelated parallel batch machines; NP-hard; Makespan; Heuristics; TOTAL WEIGHTED TARDINESS; MAKESPAN MINIMIZATION; MINIMIZING MAKESPAN; GENETIC ALGORITHM; FAMILIES; OPTIMIZATION;
D O I
10.1016/j.cor.2016.08.015
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This research analyzes the problem of scheduling a set of n jobs with arbitrary job sizes and non-zero ready times on a set of m unrelated parallel batch processing machines so as to minimize the makespan. Unrelated parallel machine is a generalization of the identical parallel processing machines and is closer to real-world production systems. Each machine can accommodate and process several jobs simultaneously as a batch as long as the machine capacity is not exceeded. The batch processing time and the batch ready time are respectively equal to the largest processing time and the largest ready time among all the jobs in the batch. Motivated by the computational complexity and the practical relevance of the problem, we present several heuristics based on first-fit and best-fit earliest job ready time rules. We also present a mixed integer programming model for the problem and a lower bound to evaluate the quality of the heuristics. The small computational effort of deterministic heuristics, which is valuable in some practical applications, is also one of the reasons that motivates this study. The results show that the heuristic proposed in this paper has a superior performance compared to the heuristics based on ideas proposed in the literature. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:117 / 128
页数:12
相关论文
共 50 条
  • [31] Scheduling a single batch processing machine with non-identical two-dimensional job sizes
    Zhou, Shengchao
    Jin, Mingzhou
    Liu, Chuang
    Zheng, Xu
    Chen, Huaping
    EXPERT SYSTEMS WITH APPLICATIONS, 2022, 201
  • [32] Approximation algorithms for scheduling jobs with release times and arbitrary sizes on batch machines with non-identical capacities
    Li, Shuguang
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 263 (03) : 815 - 826
  • [33] A simulated annealing algorithm to minimize makespan of parallel batch processing machines with unequal job ready times
    Damodaran, Purushothaman
    Velez-Gallego, Mario C.
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (01) : 1451 - 1458
  • [34] Scheduling job families on non-identical parallel machines with time constraints
    Obeid, Ali
    Dauzere-Peres, Stephane
    Yugma, Claude
    ANNALS OF OPERATIONS RESEARCH, 2014, 213 (01) : 221 - 234
  • [35] SCHEDULING JOB FAMILIES ON NON-IDENTICAL PARALLEL MACHINES WITH TIME CONSTRAINTS
    Obeid, Ali
    Dauzere-Peres, Stephane
    Yugma, Claude
    PROCEEDINGS OF THE 2011 WINTER SIMULATION CONFERENCE (WSC), 2011, : 1994 - 2005
  • [36] Scheduling job families on non-identical parallel machines with time constraints
    Ali Obeid
    Stéphane Dauzère-Pérès
    Claude Yugma
    Annals of Operations Research, 2014, 213 : 221 - 234
  • [37] A Hybrid Differential Evolution Algorithm for Scheduling Parallel Batch Processing Machine with Unequal Job Ready Times
    Jafari, Azizollah
    Hassani, Somayeh
    Chiniforooshan, Payam
    WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, WCECS 2012, VOL II, 2012, : 1421 - 1426
  • [38] Minimising makespan heuristics for scheduling a single batch machine processing machine with non-identical job sizes
    Lee, Yoon Ho
    Lee, Young Hoon
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (12) : 3488 - 3500
  • [39] Scheduling batch processing machine problem with non-identical job sizes via artificial immune system
    Chung, Tsui-Ping
    Sun, Heng
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2018, 35 (03) : 129 - 134
  • [40] EFFECTIVE HEURISTICS FOR MAKESPAN MINIMIZATION IN PARALLEL BATCH MACHINES WITH NON-IDENTICAL CAPACITIES AND JOB RELEASE TIMES
    Jia, Zhao-Hong
    Wen, Ting-Ting
    Leung, Joseph Y. -T.
    Li, Kai
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2017, 13 (02) : 977 - 993