Scheduling unrelated parallel batch processing machines with non-identical job sizes and unequal ready times

被引:68
|
作者
Arroyo, Jose Elias C. [1 ]
Leung, Joseph Y. -T. [2 ,3 ]
机构
[1] Univ Fed Vicosa, Dept Comp Sci, BR-36570900 Vicosa, MG, Brazil
[2] Hefei Univ Technol, Sch Management, Hefei 230009, Anhui, Peoples R China
[3] New Jersey Inst Technol, Dept Comp Sci, Newark, NJ 07102 USA
关键词
Scheduling; Unrelated parallel batch machines; NP-hard; Makespan; Heuristics; TOTAL WEIGHTED TARDINESS; MAKESPAN MINIMIZATION; MINIMIZING MAKESPAN; GENETIC ALGORITHM; FAMILIES; OPTIMIZATION;
D O I
10.1016/j.cor.2016.08.015
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This research analyzes the problem of scheduling a set of n jobs with arbitrary job sizes and non-zero ready times on a set of m unrelated parallel batch processing machines so as to minimize the makespan. Unrelated parallel machine is a generalization of the identical parallel processing machines and is closer to real-world production systems. Each machine can accommodate and process several jobs simultaneously as a batch as long as the machine capacity is not exceeded. The batch processing time and the batch ready time are respectively equal to the largest processing time and the largest ready time among all the jobs in the batch. Motivated by the computational complexity and the practical relevance of the problem, we present several heuristics based on first-fit and best-fit earliest job ready time rules. We also present a mixed integer programming model for the problem and a lower bound to evaluate the quality of the heuristics. The small computational effort of deterministic heuristics, which is valuable in some practical applications, is also one of the reasons that motivates this study. The results show that the heuristic proposed in this paper has a superior performance compared to the heuristics based on ideas proposed in the literature. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:117 / 128
页数:12
相关论文
共 50 条
  • [21] Meta-heuristic algorithms for scheduling on parallel batch machines with unequal job ready times
    Fidelis, Michele B.
    Arroyo, Jose Elias C.
    2017 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2017, : 542 - 547
  • [22] Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
    Mönch, L
    Balasubramanian, H
    Fowler, JW
    Pfund, ME
    COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (11) : 2731 - 2750
  • [23] Minimising makespan for two batch-processing machines with non-identical job sizes in job shop
    Cheng, Bayi
    Yang, Shanlin
    Ma, Ying
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2012, 43 (12) : 2185 - 2192
  • [24] Fair scheduling on parallel batch machines with non-identical capacities
    Zhang, Cui-Lin
    Fan, Guo-Qiang
    Wang, Jun-Qiang
    ENGINEERING OPTIMIZATION, 2024,
  • [25] Minimizing makespan for mixed batch scheduling with identical machines and unequal ready times
    Huang, Jindian
    SCIENTIFIC REPORTS, 2025, 15 (01):
  • [26] A hybrid cuckoo search algorithm in parallel batch processing machines with unequal job ready times
    Majumder, Arindam
    Laha, Dipak
    Suganthan, P. N.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 124 : 65 - 76
  • [27] Mixed batch scheduling with non-identical job sizes to minimize makespan
    Fan, Guo-Qiang
    Wang, Jun-Qiang
    Liu, Zhixin
    OR SPECTRUM, 2025, 47 (01) : 105 - 127
  • [28] Scheduling jobs with sizes and delivery times on identical parallel batch machines
    Li, Yijie
    Li, Shuguang
    THEORETICAL COMPUTER SCIENCE, 2020, 841 : 1 - 9
  • [29] An ACO algorithm for makespan minimization in parallel batch machines with non-identical job sizes and incompatible job families
    Jia, Zhao-hong
    Wang, Chao
    Leung, Joseph Y. -T.
    APPLIED SOFT COMPUTING, 2016, 38 : 395 - 404
  • [30] Earliness-tardiness minimization on scheduling a batch processing machine with non-identical job sizes
    Li, Zhongya
    Chen, Huaping
    Xu, Rui
    Li, Xueping
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 87 : 590 - 599