共 50 条
- [34] Simulation of tunnel boring machine utilization: A case study JOURNAL OF MINING AND ENVIRONMENT, 2018, 9 (01): : 53 - 60
- [35] Modified Q-index for prediction of rock mass quality around a tunnel excavated with a tunnel boring machine (TBM) Bulletin of Engineering Geology and the Environment, 2019, 78 : 3755 - 3766
- [38] Comparison and correlation between the laboratory, semi-theoretical and empirical methods in predicting the field excavation performance of tunnel boring machine (TBM) Acta Geotechnica, 2022, 17 : 653 - 676
- [39] Fuzzy logic modelling to predict the level of geotechnical risks in rock Tunnel Boring Machine (TBM) tunnelling RUDARSKO-GEOLOSKO-NAFTNI ZBORNIK, 2020, 35 (02): : 1 - 14