The effects of placement conditions on the quality of concrete in large-diameter bored piles

被引:0
|
作者
Fanourakis, G. C. [1 ]
Day, P. W. [2 ]
Grieve, G. R. H. [3 ,4 ]
机构
[1] Univ Johannesburg, Dept Civil Engn Technol, ZA-2028 Doornfontein, South Africa
[2] Jones & Wagener Pty Ltd Consulting Engineers, ZA-2128 Rivonia, South Africa
[3] CSIR, Coastal Res Unit, Stellenbosch, South Africa
[4] Portland Cement Inst, Lab Serv, Halfway House, South Africa
关键词
piles; concrete; quality control; site practices;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In South Africa, concrete in large-diameter bored piles is generally placed by discharging a high-flow concrete mix directly from the truck mixer and allowing the concrete to fall freely to the base of the pile hole. While certain site practices have been used by piling contractors for years, many engineers are not convinced of their acceptability. In order to assess the effects of free-fall concrete placement, a series of tests were undertaken in which the properties of concrete placed in this manner were compared with the properties of conventionally placed concrete. The tests included an assessment of the effect of water and spoil in the pile hole at the time of casting, as well as poor placement techniques. The results of this investigation indicate that casting of concrete in 50 mm and 400 mm of water in the bottom of the pile hole significantly reduced the compressive strength by approximately 50% and 80%, respectively. Furthermore, the effect of spoil at the bottom of the pile hole was dependent on the amount of water present. Finally, a separate investigation, at a bridge site, indicated the free-fall placement technique to be at least as effective as the tremie technique.
引用
收藏
页码:86 / 93
页数:8
相关论文
共 50 条
  • [41] GEOTECHNICAL RISK ASSESSMENT FOR LARGE-DIAMETER RAISE-BORED SHAFTS
    MCCRACKEN, A
    STACEY, TR
    TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1989, 98 : A145 - A150
  • [42] The performance of large diameter bored piles used for a road project in Malaysia
    Jamaludin, A
    Hussein, AN
    DEEP FOUNDATIONS ON BORED AND AUGER PILES - BAP III, 1998, : 335 - 339
  • [43] Side resistance of large diameter bored piles socketed into decomposed rocks
    Ng, CWW
    Yau, TLY
    Li, JHM
    Tang, WH
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2001, 127 (08) : 642 - 657
  • [44] CONSTRUCTION OF LARGE DIAMETER BORED PILES WITH PARTICULAR REFERENCE TO LONDON CLAY
    PALMER, DJ
    HOLLAND, GR
    CONCRETE AND CONSTRUCTIONAL ENGINEERING, 1966, 61 (08): : 279 - &
  • [45] Large diameter bored piles in multi-layered soils of Bangkok
    Thasnanipan, N
    Tanseng, P
    Anwar, MA
    DEEP FOUNDATIONS ON BORED AND AUGER PILES - BAP III, 1998, : 511 - 518
  • [46] BACK-ANALYSIS FOR DESIGN PARAMETERS OF LARGE DIAMETER BORED PILES
    Raongjant, Werasak
    Jing, Meng
    CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 186 - 189
  • [47] Horizontal Load Carrying Capacity of Large Diameter Bored Piles.
    Stamm, Joachim
    Tiefbau, 1973, 15 (04): : 334 - 340
  • [48] Innovative Use of FRP in Large-Diameter Piles for Vessel Impact
    McCarty, M. A.
    Zanjani, V.
    Grimnes, E.
    Marquis, J.
    STRUCTURES CONGRESS 2017: BUILDINGS AND SPECIAL STRUCTURES, 2017, : 735 - 744
  • [49] Large-diameter piles in chalk - part 2, design and construction
    Ganesharatnam, Lohini
    O'Leary, Frank
    Morrison, Paul
    Kwan, Vivien
    Thorp, Aidan
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2018, 171 (06) : 486 - 501
  • [50] Horizontal dynamic response of offshore large-diameter pipe piles
    Zheng, Changjie
    Lin, Hao
    Cao, Guangwei
    Luan, Lubao
    OCEAN ENGINEERING, 2023, 272