The effects of placement conditions on the quality of concrete in large-diameter bored piles

被引:0
|
作者
Fanourakis, G. C. [1 ]
Day, P. W. [2 ]
Grieve, G. R. H. [3 ,4 ]
机构
[1] Univ Johannesburg, Dept Civil Engn Technol, ZA-2028 Doornfontein, South Africa
[2] Jones & Wagener Pty Ltd Consulting Engineers, ZA-2128 Rivonia, South Africa
[3] CSIR, Coastal Res Unit, Stellenbosch, South Africa
[4] Portland Cement Inst, Lab Serv, Halfway House, South Africa
关键词
piles; concrete; quality control; site practices;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In South Africa, concrete in large-diameter bored piles is generally placed by discharging a high-flow concrete mix directly from the truck mixer and allowing the concrete to fall freely to the base of the pile hole. While certain site practices have been used by piling contractors for years, many engineers are not convinced of their acceptability. In order to assess the effects of free-fall concrete placement, a series of tests were undertaken in which the properties of concrete placed in this manner were compared with the properties of conventionally placed concrete. The tests included an assessment of the effect of water and spoil in the pile hole at the time of casting, as well as poor placement techniques. The results of this investigation indicate that casting of concrete in 50 mm and 400 mm of water in the bottom of the pile hole significantly reduced the compressive strength by approximately 50% and 80%, respectively. Furthermore, the effect of spoil at the bottom of the pile hole was dependent on the amount of water present. Finally, a separate investigation, at a bridge site, indicated the free-fall placement technique to be at least as effective as the tremie technique.
引用
收藏
页码:86 / 93
页数:8
相关论文
共 50 条
  • [31] Self-balanced method for large-diameter bored piles of Hong Kong-Zhuhai-Macao Bridge
    Wang, Z.-W. (wangzhongwen@vip.163.com), 1600, Chinese Society of Civil Engineering (35):
  • [32] Bearing capacity and simplified calculation approach for large-diameter plain-concrete piles
    Wang L.
    Zhao Q.
    Mao J.
    Wu J.
    Guo F.
    Arabian Journal of Geosciences, 2021, 14 (15)
  • [33] Centrifuge modeling of large-diameter bored pile groups with defects
    Zhang, L. M.
    Wong, Eric Y. W.
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2007, 133 (09) : 1091 - 1101
  • [34] Challenges in Large-Diameter Bored Piling in Coralline Rock Formations
    Pitchumani, N. Kumar
    Giovanny, Alvarado
    Khatavkar, Aditya S.
    INDIAN GEOTECHNICAL JOURNAL, 2024, 54 (05) : 1767 - 1778
  • [35] Response of laterally loaded large-diameter bored pile groups
    Ng, CWW
    Zhang, LM
    Nip, DCN
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2001, 127 (08) : 658 - 669
  • [36] Behavior of large diameter floating bored piles in saprolitic soils
    Ng, CWW
    Li, JHM
    Yau, TLY
    SOILS AND FOUNDATIONS, 2001, 41 (06) : 37 - 52
  • [37] Evaluation of coatings for large-diameter, prestressed concrete pipeline in aggressive conditions
    Hurle, Shaun A.
    Blake, Andrew T.
    Journal of Protective Coatings and Linings, 2000, 17 (12): : 41 - 47
  • [38] Skin friction of large-diameter piles socketed into rock
    Carrubba, P
    CANADIAN GEOTECHNICAL JOURNAL, 1997, 34 (02) : 230 - 240
  • [39] Bearing deformation of large-diameter and super-long bored piles based on pile shaft generalized shear model
    Li, Yong-Hui
    Wang, Wei-Dong
    Wu, Jiang-Bin
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2015, 37 (12): : 2157 - 2166
  • [40] Construction Technique for Completing Bored Holes of Very Large Diameter Bored Piles in Two Times Under Complex Geological Conditions
    复杂地质下超大直径钻孔桩二次成孔施工技术
    Lang, Lyu-Yuan (517917375@qq.com), 2018, Wuhan Bridge Research Institute (48)