Production Planning for Parallel Machine Working System using Makespan Determination

被引:0
|
作者
Aromstian, D. [1 ]
Homrossukon, S. [1 ]
机构
[1] Thammasat Univ, Dept Ind Engn, Klongluang 12120, Pathum Thani, Thailand
关键词
Production Planning; Makespan; Parallel Machine; Production Efficiency; SCHEDULING JOBS; DATES;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
This work developed the method used to plan the production for parallel machines, aiming to achieve the maximum working efficiency condition. There are two types of machines, regular and special. The same type of machine might work independently and/or dependently depending on the processes required but for the different type, machine will work dependently. The model based on the determination of machine makespan was applied in order to assign the works providing the maximum daily working time or the minimum idle time of each machine. The constrained conditions were determined, based on the nature of the production of interest. The developed method could establish the efficient plan according to the former study and provide the working efficiency being higher than 90%, comparing to original plan having efficiency only 60-70%.
引用
收藏
页码:1774 / 1778
页数:5
相关论文
共 50 条
  • [41] A multi-exchange neighborhood for minimum makespan parallel machine scheduling problems
    Frangioni, A
    Necciari, E
    Scutellà, MG
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2004, 8 (02) : 195 - 220
  • [42] A Multi-Exchange Neighborhood for Minimum Makespan Parallel Machine Scheduling Problems
    Antonio Frangioni
    Emiliano Necciari
    Maria Grazia Scutellà
    Journal of Combinatorial Optimization, 2004, 8 : 195 - 220
  • [43] Optimizing fuzzy makespan and tardiness for unrelated parallel machine scheduling with archived metaheuristics
    Chyu, Chiuh-Cheng
    Chang, Wei-Shung
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 57 (5-8): : 763 - 776
  • [44] A modified LPT algorithm for the two uniform parallel machine makespan minimization problem
    Koulamas, Christos
    Kyparisis, George J.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 196 (01) : 61 - 68
  • [45] Online scheduling on an unbounded parallel-batch machine to minimize the weighted makespan
    Zhang, Han
    Lu, Lingfa
    Yuan, Jinjiang
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2025, 49 (01)
  • [46] Parallel-machine parallel-batching scheduling with family jobs and release dates to minimize makespan
    Shisheng Li
    Jinjiang Yuan
    Journal of Combinatorial Optimization, 2010, 19 : 84 - 93
  • [47] Parallel-machine parallel-batching scheduling with family jobs and release dates to minimize makespan
    Li, Shisheng
    Yuan, Jinjiang
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2010, 19 (01) : 84 - 93
  • [48] Parallel machine scheduling problem to minimize the makespan with resource dependent processing times
    Li, Kai
    Shi, Ye
    Yang, Shan-lin
    Cheng, Ba-yi
    APPLIED SOFT COMPUTING, 2011, 11 (08) : 5551 - 5557
  • [49] Optimizing fuzzy makespan and tardiness for unrelated parallel machine scheduling with archived metaheuristics
    Chiuh-Cheng Chyu
    Wei-Shung Chang
    The International Journal of Advanced Manufacturing Technology, 2011, 57 : 763 - 776
  • [50] MINIMIZING FLOW TIME IN PARALLEL MACHINE SCHEDULE PROBLEM SUBJECT TO MINIMUM MAKESPAN
    Wang, Xiongzhi
    Wen, Xiaowei
    ICIM 2008: PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2008, : 42 - 50