A Multi-Exchange Neighborhood for Minimum Makespan Parallel Machine Scheduling Problems

被引:0
|
作者
Antonio Frangioni
Emiliano Necciari
Maria Grazia Scutellà
机构
[1] Largo B. Pontecorvo 1,Dipartimento di Informatica
来源
关键词
production/scheduling; approximations/heuristic: multi-exchange neighborhood; networks/graphs; flow algorithms: disjoint cycle computation;
D O I
暂无
中图分类号
学科分类号
摘要
We propose new local search algorithms for minimum makespan parallel machine scheduling problems, which perform multiple exchanges of jobs among machines. Inspired by the work of Thompson and Orlin (1989) on cyclic transfer neighborhood structures, we model multiple exchanges of jobs as special disjoint cycles and paths in a suitably defined improvement graph, by extending definitions and properties introduced in the context of vehicle routing problems (Thompson and Psaraftis, 1993) and of the capacitated minimum spanning tree problem (Ahuja et al., 2001). Several algorithms for searching the neighborhood are suggested.
引用
收藏
页码:195 / 220
页数:25
相关论文
共 50 条
  • [1] A multi-exchange neighborhood for minimum makespan parallel machine scheduling problems
    Frangioni, A
    Necciari, E
    Scutellà, MG
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2004, 8 (02) : 195 - 220
  • [2] Multi-exchange neighborhood structures for the capacitated minimum spanning tree problem
    Ravindra K. Ahuja
    James B. Orlin
    Dushyant Sharma
    Mathematical Programming, 2001, 91 : 71 - 97
  • [3] Multi-exchange neighborhood structures for the capacitated minimum spanning tree problem
    Ahuja, RK
    Orlin, JB
    Sharma, D
    MATHEMATICAL PROGRAMMING, 2001, 91 (01) : 71 - 97
  • [4] Variable Neighborhood Search for Minimizing the Makespan in a Uniform Parallel Machine Scheduling
    Bamatraf, Khaled
    Gharbi, Anis
    SYSTEMS, 2024, 12 (06):
  • [5] Variable Neighborhood Search for Multi-Objective Parallel Machine Scheduling Problems
    Liang, Yun-Chia
    Chen, Angela Hsiang-Ling
    Tien, Chia-Yun
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 519 - 522
  • [6] A COMPOSITE HEURISTIC FOR THE IDENTICAL PARALLEL MACHINE SCHEDULING PROBLEM WITH MINIMUM MAKESPAN OBJECTIVE
    FRANCA, PM
    GENDREAU, M
    LAPORTE, G
    MULLER, FM
    COMPUTERS & OPERATIONS RESEARCH, 1994, 21 (02) : 205 - 210
  • [7] An Order Effect of Neighborhood Structures in Variable Neighborhood Search Algorithm for Minimizing the Makespan in an Identical Parallel Machine Scheduling
    Alharkan, Ibrahim
    Bamatraf, Khaled
    Noman, Mohammed A.
    Kaid, Husam
    Nasr, Emad S. Abouel
    El-Tamimi, Abdulaziz M.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2018, 2018
  • [8] A multi-exchange neighborhood search heuristic for an integrated clustering and machine setup model for PCB manufacturing
    Magazine, MJ
    Polak, GG
    Sharma, D
    JOURNAL OF ELECTRONICS MANUFACTURING, 2002, 11 (02): : 107 - 119
  • [9] A note on the optimal makespan of a parallel machine scheduling problem
    Li, Yumei
    Gu, Yundong
    Sun, Kaibiao
    Li, Hongxing
    FUZZY INFORMATION AND ENGINEERING, PROCEEDINGS, 2007, 40 : 481 - +
  • [10] Tropical optimization problems with application to project scheduling with minimum makespan
    Nikolai Krivulin
    Annals of Operations Research, 2017, 256 : 75 - 92