Construction Plan for Flood Detention Areas in Lower Yellow River

被引:0
|
作者
Liu Juan [1 ]
Cui Changyong [1 ]
Cui Meng [1 ]
Cai Chunxiang [1 ]
机构
[1] Yellow River Engn Consulting Co Ltd, Zhengzhou 450003, Peoples R China
关键词
lower Yellow River; the flood detention area; Dongping Lake flood detention area; Beijindi flood detention area; construction plan;
D O I
暂无
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
Dongping Lake flood detention area and Beijindi flood detention area are the two most important flood detention areas in lower Yellow River. Due to long term insufficient investment, the engineering, non engineering and safety construction in these areas are far lagging behind, which causes serious problems. In order to improve the operation safety of the flood detention areas as well as the safety of people's lives and property in these areas, construction plan is put forward based on the analysis of construction situation and existing problems. The construction plan includes the construction contents and scale of engineering measures, and that of non structural measures. In addition, three resettlement schemes, namely resettlement of moving outside, nearby resettlement and temporary evacuation, are introduced to reduce the flood risk of residents in the flood detention areas. The corresponding population scale of each settlement scheme is analyzed, along with the construction contents and scale of the supporting safety facilities.
引用
收藏
页码:329 / 333
页数:5
相关论文
共 50 条
  • [41] Flood Control through Engineered Avulsions and Floodways in the Lower Yellow River
    Chen, Liang
    Hobbs, Benjamin F.
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2020, 146 (02)
  • [42] The Key Technology in Flood Risk Mapping on the Floodplain of Lower Yellow River
    Wang Zhongmei
    Lan Hualin
    Huo Fenglin
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 463 - 465
  • [43] Dike Breach Risks of Different Flood Conditions in the Lower Yellow River
    Xia Fuqiang
    Wu Shaohong
    Yang Qinye
    Kang Xiangwu
    Ma Xin
    CHINESE JOURNAL OF POPULATION RESOURCES AND ENVIRONMENT, 2010, 8 (01) : 18 - 27
  • [44] STUDY ON AND ASSESSMENT OF FLOOD PREVENTION MEASURES ON THE LOWER YELLOW-RIVER
    WU, ZY
    TAMING THE YELLOW RIVER : SILT AND FLOODS, 1989, 13 : 387 - 406
  • [45] FLOOD MANAGEMENT ON THE LOWER YELLOW-RIVER - HYDROLOGICAL AND GEOMORPHOLOGICAL PERSPECTIVES
    SHU, L
    FINLAYSON, B
    SEDIMENTARY GEOLOGY, 1993, 85 (1-4) : 285 - 296
  • [46] FLUVIAL PROCESSES OF THE LOWER YELLOW-RIVER AND ESTIMATION OF FLOOD CONDITIONS
    YE, QC
    TAMING THE YELLOW RIVER : SILT AND FLOODS, 1989, 13 : 261 - 274
  • [47] Impact of Channel Shrinkage on Flood Routing along the Lower Yellow River
    Wenyi, Yao
    Yong, Li
    Xin'ai, Jing
    Aizhong, Hou
    PROCEEDINGS OF THE 3RD INTERNATIONAL YELLOW RIVER FORUM ON SUSTAINABLE WATER RESOURCES MANAGEMENT AND DELTA ECOSYSTEM MAINTENANCE, VOL III, 2007, : 240 - 248
  • [48] Study on the Water and Sediment Regulation of Moderate Flood in the Lower Yellow River
    Zhu Jie
    Wei Xiangyang
    Shi Yupin
    PROCEEDINGS OF THE 4TH INTERNATIONAL YELLOW RIVER FORUM ON ECOLOGICAL CIVILIZATION AND RIVER ETHICS, VOL IV, 2010, : 322 - 329
  • [49] Function and Security Building of the Floodplain Areas in the Lower Yellow River
    Hu Yisan
    PROCEEDINGS OF THE 4TH INTERNATIONAL YELLOW RIVER FORUM ON ECOLOGICAL CIVILIZATION AND RIVER ETHICS, VOL III, 2010, : 3 - 8