Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers

被引:1
|
作者
Hao, Jianhong [1 ]
Cao, Lisi [2 ,3 ]
Jiang, Dakui [2 ]
机构
[1] China Automot Technol & Res Ctr, Automot Engn Res Inst, Tianjin 300300, Peoples R China
[2] Tianjin Univ, Coll Management & Econ, Tianjin 300072, Peoples R China
[3] Tianjin Foreign Studies Univ, Sch Int Business, Tianjin 300270, Peoples R China
关键词
ORDER; BATCH;
D O I
10.1155/2015/579893
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider the nonstandard parts supply chain with a public service platform for machinery integration in China. The platform assigns orders placed by a machinery enterprise to multiple independent manufacturers who produce nonstandard parts and makes production schedule and batch delivery schedule for each manufacturer in a coordinate manner. Each manufacturer has only one plant with parallel machines and is located at a location far away from other manufacturers. Orders are first processed at the plants and then directly shipped from the plants to the enterprise in order to be finished before a given deadline. We study the above integrated production-distribution scheduling problem with multiple manufacturers to maximize a weight sum of the profit of each manufacturer under the constraints that all orders are finished before the deadline and the profit of each manufacturer is not negative. According to the optimal condition analysis, we formulate the problem as a mixed integer programming model and use CPLEX to solve it.
引用
收藏
页数:5
相关论文
共 50 条
  • [41] Application of Fuzzy Mathematical Programming to Optimize an Integrated Production-distribution System
    Ahmadizar, Fardin
    Zeynivand, Mehdi
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 1195 - 1198
  • [42] An Integrated Production-distribution Problem of Perishable Items with Dynamic Pricing Consideration in a Three-echelon Supply Chain
    Yegane B.Y.
    Int. J. Eng. Trans. A Basics, 2023, 11 (2038-2051): : 2038 - 2051
  • [43] The impact of liner shipping unreliability on the production-distribution scheduling of a decentralized manufacturing system
    Sun, X. T.
    Chung, S. H.
    Ghan, Felix T. S.
    Wang, Zheng
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2018, 114 : 242 - 269
  • [44] Strong Formulations for a Capacitated Multi-Vehicle Production-Distribution Problem
    Senoussi, Ahmed
    Mouss, Nadia Kinza
    Penz, Bernard
    Brahimi, Nadjib
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IEEE-IESM 2013), 2013, : 629 - 635
  • [45] A Hybrid Genetic Algorithm for Integrated Production and Distribution Scheduling Problem with Outsourcing Allowed
    Izadi, L.
    Ahmadizar, F.
    Arkat, J.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2020, 33 (11): : 2285 - 2298
  • [46] An improved algorithm for integrated production and distribution scheduling problem with committed delivery dates
    Zhong, Weiya
    OPTIMIZATION LETTERS, 2015, 9 (03) : 537 - 567
  • [47] An improved algorithm for integrated production and distribution scheduling problem with committed delivery dates
    Weiya Zhong
    Optimization Letters, 2015, 9 : 537 - 567
  • [48] OPTIMIZATION AND PERFORMANCE EVALUATION OF AN INTEGRATED PRODUCTION-DISTRIBUTION PLAN IN SUPPLY CHAINS
    Fahimnia, Behnam
    Luong, Lee
    Marian, Romeo
    IMECE2009, VOL 4, 2010, : 89 - 98
  • [49] INTERACTIONS IN PRODUCTION-DISTRIBUTION SYSTEMS
    HEFFERNAN, JJ
    SLOAN MANAGEMENT REVIEW, 1971, 12 (03): : 63 - 75
  • [50] Integrated scheduling of production and distribution operations
    Chen, ZL
    Vairaktarakis, GL
    MANAGEMENT SCIENCE, 2005, 51 (04) : 614 - 628