Delayed hydride cracking behavior of Zr-2.5Nb alloy pressure tubes for PHWR700

被引:13
|
作者
Sunil, S. [1 ]
Bind, A. K. [1 ]
Khandelwal, H. K. [1 ]
Singh, R. N. [1 ]
Chakravartty, J. K. [1 ]
机构
[1] Bhabha Atom Res Ctr, Mech Met Div, Bombay 400085, Maharashtra, India
关键词
Zr-2.5Nb alloy; PHWR700; Pressure tube; Delayed hydride cracking; STRESS INTENSITY FACTOR; ZIRCONIUM ALLOYS; HYDROGEN CONCENTRATION; PCT NB; FABRICATION; TEXTURE; MICROSTRUCTURE; TEMPERATURE; DEPENDENCE; REACTORS;
D O I
10.1016/j.jnucmat.2015.08.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In order to attain improved in-reactor performance few prototypes pressure tubes of Zr-2.5Nb alloy were manufactured by employing forging to break the cast structure and to obtain more homogeneous microstructure. Both double forging and single forging were employed. The forged material was further processed by employing hot extrusion, cold pilgering and autoclaving. A detailed characterization in terms of mechanical properties and microstructure of the prototype tubes were carried for qualifying it for intended use as pressure tubes in PHWR700 reactors. In this work, Delayed Hydride Cracking (DHC) behavior of the forged Zr-2.5Nb pressure tube material characterized in terms of DHC velocity and threshold stress intensity factor associated with DHC (K-JH) was compared with that of conventionally manufactured material in the temperature range of 200-283 degrees C. Activation energy associated with the DHC in this alloy was found to be similar to 60 kymol for the forged materials. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:208 / 219
页数:12
相关论文
共 50 条
  • [21] EFFECT OF FLAW ORIENTATION ON DELAYED HYDRIDE CRACK INITIATION IN ZR-2.5NB PRESSURE TUBES
    Shek, Gordon K.
    Cui, Jun
    Scarth, Douglas A.
    Xu, Steven
    PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE - 2013, VOL 6A: MATERIALS AND FABRICATION, 2014,
  • [22] Hydride distribution around a blister in Zr-2.5Nb pressure tubes
    Domizzi, G
    Vigna, G
    Bermúdez, S
    Ovejero-García, J
    JOURNAL OF NUCLEAR MATERIALS, 1999, 275 (03) : 255 - 267
  • [23] Effect of metallurgical variables on hydride precipitation behavior in Zr-2.5Nb micro pressure tubes
    Long, F.
    Goldthorpe, S.
    Daymond, M. R.
    JOURNAL OF NUCLEAR MATERIALS, 2022, 571
  • [24] The effect of annealing on hardness, microstructure and delayed hydride cracking in Zr-2.5Nb pressure tube material
    Jovanovic, MT
    Eadie, RL
    Ma, Y
    Anderson, M
    Sagat, S
    Perovic, V
    MATERIALS CHARACTERIZATION, 2001, 47 (3-4) : 259 - 268
  • [25] A microstructure-based modeling of delayed hydride cracking in Zr-2.5Nb pressure tube material
    Jha, Anjali
    Sarkar, Subrato
    Singh, I. V.
    Mishra, B. K.
    Singh, Ritu
    ENGINEERING FRACTURE MECHANICS, 2024, 295
  • [26] Anisotropic threshold stress intensity factor, KIH and crack growth rate in delayed hydride cracking of Zr-2.5Nb pressure tubes
    Young Suk Kim
    Sung Soo Kim
    Sang Chul Kwon
    Yong Moo Cheong
    Kyung Soo Im
    Metallurgical and Materials Transactions A, 2002, 33 : 919 - 925
  • [27] Anisotropic threshold stress intensity factor, KIH and crack growth rate in delayed hydride cracking of Zr-2.5Nb pressure tubes
    Kim, YS
    Kim, SS
    Kwon, SC
    Im, KS
    Cheong, YM
    METALLURGICAL AND MATERIALS TRANSACTIONS A-PHYSICAL METALLURGY AND MATERIALS SCIENCE, 2002, 33 (03): : 919 - 925
  • [28] Hydrogen redistribution during hydride precipitation in Zr-2.5Nb pressure tubes
    Muller, S.
    De Las Heras, M. E.
    Alcantar, S.
    Luppo, M. I.
    Mieza, J. I.
    JOURNAL OF NUCLEAR MATERIALS, 2021, 543
  • [29] The delayed hydride cracking avoidance manoeuvre for Zr-2.5 Nb pressure tube alloy
    Yan, D
    Sun, S
    Eadie, RL
    Shek, GK
    Seahra, H
    INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 2000, 77 (09) : 531 - 538
  • [30] EFFECT OF HYDROGEN ISOTOPE AND CONCENTRATION ON DELAYED HYDRIDE CRACK GROWTH RATES IN ZR-2.5NB PRESSURE TUBES
    Shek, Gordon K.
    Seahra, Harry
    PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 5, 2011, : 559 - 569