Need for Alternative Research Approaches in Construction Management: Case of Delay Studies

被引:82
|
作者
AlSehaimi, Abdullah [1 ]
Koskela, Lauri [2 ]
Tzortzopoulos, Patricia [2 ]
机构
[1] Minist Hlth, Medinah, Saudi Arabia
[2] Univ Salford, Sch Built Environm, Salford M5 4WT, Lancs, England
基金
英国工程与自然科学研究理事会;
关键词
Construction delay; Action research; Constructive research; DESIGN SCIENCE; DISPUTES;
D O I
10.1061/(ASCE)ME.1943-5479.0000148
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Over the years, there have been many studies of delay in construction, and this type of study continues to be popular in construction management research. A synthesis and critical evaluation of delay studies in developing countries reveals that poor project management is cited as one of the main causes of delay. However, despite significant consensus, most published studies fall short of providing clear recommendations for the improvement of project management practice. Moreover, the majority of recommendations are general and not devoted to solving the difficulties associated with particular causes of delay. This paper aims to demonstrate that the root cause of this state of affairs is that typical research into delay tends to be descriptive and explanatory, making it inadequate for solving persistent managerial problems in construction. It is contended that many problems in construction could be mitigated through alternative research approaches, i.e.,action and constructive research. Such prescriptive research methods can assist in the development and implementation of innovative tools tackling managerial problems of construction, including that of delay. In so doing, those methods will better connect research and practice, and thus strengthen the relevance of academic construction management. (C) 2013 American Society of Civil Engineers.
引用
收藏
页码:407 / 413
页数:7
相关论文
共 50 条
  • [21] Alternative approaches to programme management
    British Telecommunications , London, United Kingdom
    International Journal of Project Management, 15 (01): : 5 - 9
  • [22] Challenging complacency in construction management research: the case of PPPs
    Sherratt, Fred
    Sherratt, Simon
    Ivory, Chris
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2020, 38 (12) : 1086 - 1100
  • [23] Genomic studies in ageing research: the need to integrate genetic and gene expression approaches
    Passtoors, W. M.
    Beekman, M.
    Gunn, D.
    Boer, J. M.
    Heijmans, B. T.
    Westendorp, R. G. J.
    Zwaan, B. J.
    Slagboom, P. E.
    JOURNAL OF INTERNAL MEDICINE, 2008, 263 (02) : 153 - 166
  • [26] Quality management case studies in the UK construction industry
    Delgado-Hernandez, David Joaquin
    Aspinwall, Elaine
    TOTAL QUALITY MANAGEMENT & BUSINESS EXCELLENCE, 2008, 19 (09) : 919 - 938
  • [27] NOTE ON ALTERNATIVE APPROACHES TO TEST-CONSTRUCTION
    HELLMAN, BM
    PSYCHOLOGICAL REPORTS, 1959, 5 (02) : 381 - 384
  • [28] The need for phosphoproteomic approaches in psychiatric research
    Martins-de-Souza, Daniel
    Guest, Paul C.
    Vanattou-Saifoudine, Natacha
    Wesseling, Hendrik
    Rahmoune, Hassan
    Bahn, Sabine
    JOURNAL OF PSYCHIATRIC RESEARCH, 2011, 45 (10) : 1404 - 1406
  • [29] Using teaching case studies for management research
    Ambrosini, Veronique
    Bowman, Cliff
    Collier, Nardine
    STRATEGIC ORGANIZATION, 2010, 8 (03) : 206 - 229
  • [30] Alternative Approaches of Capacity Assignment for Delay Bounded Traffic
    Liu, Xian
    GLOBECOM 2008 - 2008 IEEE GLOBAL TELECOMMUNICATIONS CONFERENCE, 2008,