共 50 条
- [44] Application of Time-Cost-Quality Tradeoff Optimization Model Based on Improved PSO Algorithm to Construction Project 2009 ASIA-PACIFIC CONFERENCE ON INFORMATION PROCESSING (APCIP 2009), VOL 2, PROCEEDINGS, 2009, : 298 - 301
- [45] Ti time-cost-quality tradeoff optimization in construction project based on modified ant colony algorithm PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2008, : 1031 - 1035
- [46] Time-Cost-Quality Trade-off Model for Optimal Pile Type Selection Using Discrete Particle Swarm Optimization Algorithm CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (11): : 2461 - 2471
- [47] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238
- [50] THE DISCRETE TIME, COST AND QUALITY TRADE-OFF PROBLEM IN PROJECT SCHEDULING: AN EFFICIENT SOLUTION METHOD BASED ON CELLDE ALGORITHM SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2010, 21 (01): : 93 - 101