共 50 条
- [41] Scheduling Two-machine Flow Shop with a Batch Processing Machine CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 46 - 51
- [43] Methodology To Develop Heuristic For Re-Entrant Flow Shop With Two Potential Dominant Machines Using Bottleneck Approach INTERNATIONAL JOURNAL OF COMBINATORIAL OPTIMIZATION PROBLEMS AND INFORMATICS, 2012, 3 (03): : 81 - 93
- [46] Two-machine interval shop scheduling with time lags Journal of Scheduling, 2015, 18 : 359 - 368
- [50] Two-agent scheduling in a two-machine open shop Annals of Operations Research, 2024, 333 : 275 - 301