共 50 条
- [25] An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs 4OR, 2010, 8 : 87 - 99
- [26] Clustered Absolute Bottleneck Adjacent Matching Heuristic for Re-Entrant Flow Shop 4TH MECHANICAL AND MANUFACTURING ENGINEERING, PTS 1 AND 2, 2014, 465-466 : 1138 - 1143
- [29] An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs 4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2010, 8 (01): : 87 - 99