Physical model test study on support of super pre-stressed anchor in the mining engineering

被引:41
|
作者
Cao, Juncai [1 ,2 ]
Zhang, Nong [1 ]
Wang, Shanyong [2 ]
Qian, Deyu [1 ]
Xie, Zhengzheng [1 ]
机构
[1] China Univ Min & Technol, Sch Mines, Key Lab Deep Coal Resource Min, Minist Educ China, Xuzhou 221116, Jiangsu, Peoples R China
[2] Univ Newcastle, ARC Ctr Excellence Geotech Sci & Engn Civil Surve, Callaghan, NSW 2308, Australia
关键词
Failure process; Physical model test; Super pre-stressed anchor; Rock mechanics; Dynamic disaster; ENERGY-ABSORBING BOLT; COAL-MINE; ROADWAY; ROCK; FAILURE;
D O I
10.1016/j.engfailanal.2020.104833
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
With the increase in mining depths, support problems of anchor such as roof accidents and large deformation of soft rock are becoming more and more prominent. Whether the anchor is suitable for deep roadway support has been questioned. In order to explore this problem, this paper studies the ultimate support effect of super pre-stressed anchors. Based on current higher prestress support technology in mining engineering, a support scheme of super anchor is proposed and investigated. In this work, the super anchor scheme and the other two schemes were compared and analysed through a physical model test. The model's displacement data was recorded by a high-speed camera. Meanwhile, the numerical model with the same conditions is calculated. The results show that, the super anchor scheme can improve the stress distribution of the surrounding rock; and this method contributes to the optimization of the support parameters and improves the roof bearing capacity. In addition, the super anchor scheme has a smaller scope of damage than the other two schemes. Third, the super anchor scheme reduces the number of anchors without reducing the strength of the support, which is beneficial to the rapid excavation of the roadway. However, it is worth noting that, the end of the super anchor will produce significant stress concentration in the support process, and this easily leads to the separation and crack of the roof near the end of the super anchor. In short, the physical model test shows that, using super pre-stressed anchors is promising for solving the extremely difficult deep roadway support problems.
引用
收藏
页数:11
相关论文
共 50 条
  • [41] Pre-stressed anchor cable force evolution laws of plane sliding bedding slopes
    Bowa, Victor Mwango
    Kabwe, Eugie
    INTERNATIONAL JOURNAL OF GEO-ENGINEERING, 2023, 14 (01)
  • [42] Study of glulam beams pre-stressed with pultruded GRP
    Guan, ZW
    Rodd, PD
    Pope, DJ
    COMPUTERS & STRUCTURES, 2005, 83 (28-30) : 2476 - 2487
  • [43] EXPERIMENTAL STUDY ON PRE-STRESSED CIRCULAR CYLINDRICAL SHELL
    Zippo, Antonio
    Barbieri, Marco
    Strozzi, Matteo
    Errede, Vito
    Pellicano, Francesco
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE 2012, VOL 1, PTS A AND B, 2012, : 311 - +
  • [44] Experimental study on fatigue of pre-stressed concrete sleeper
    Yang, H.
    Rock and Soil Mechanics, 2001, 22 (03) : 357 - 360
  • [45] Study on a PZT Actuator Based on Pre-stressed Mechanism
    Huang, Yi-Cheng
    Chao, Jen-Ai
    Lin Hsiang-Jung
    2008 IEEE/ASME INTERNATIONAL CONFERENCE ON ADVANCED INTELLIGENT MECHATRONICS, VOLS 1-3, 2008, : 722 - +
  • [46] Over-pressure test on BARCOM pre-stressed concrete containment
    Parmar, R. M.
    Singh, Tarvinder
    Thangamani, I.
    Trivedi, Neha
    Singh, Ram Kumar
    NUCLEAR ENGINEERING AND DESIGN, 2014, 269 : 177 - 183
  • [47] Pre-load factor of the pre-stressed anchor cable in underground powerhouse with high geo-stress
    Zhang Jian-hai
    Wang Ren-kun
    Zhou Zhong
    Zheng Lu
    Zhang Ru
    Xie He-ping
    ROCK AND SOIL MECHANICS, 2018, 39 (03) : 1002 - 1008
  • [48] Reliability study on the application of reflected wave method in integrity test of pre-stressed pipe pile
    Huang Z.
    Zhu Z.
    Li J.
    Lu G.
    Huang, Zhonghuan (1912307077@qq.com), 2018, Lavoisier (17): : 411 - 422
  • [49] Static test of a simple support pre-stressed concrete hollow slab with two-way tube fillers
    Liu, Zhaoqing
    Qian, Jiaru
    Zhao, Zuozhou
    Xu, Yan
    Zhao, Lei
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2010, 43 (09): : 40 - 48
  • [50] DYNAMIC RESPONSE OF SLOPE SUPPORTED BY FRAME STRUCTURE WITH PRE-STRESSED ANCHOR RODS UNDER EARTHQUAKE
    Li, Ping
    Kong, Jiang-Wei
    Li, Hui-Shan
    Wang, Xiu-Li
    PROCEEDINGS OF THE ELEVENTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOL I AND II, 2010, : 1883 - 1888