Physical model test study on support of super pre-stressed anchor in the mining engineering

被引:41
|
作者
Cao, Juncai [1 ,2 ]
Zhang, Nong [1 ]
Wang, Shanyong [2 ]
Qian, Deyu [1 ]
Xie, Zhengzheng [1 ]
机构
[1] China Univ Min & Technol, Sch Mines, Key Lab Deep Coal Resource Min, Minist Educ China, Xuzhou 221116, Jiangsu, Peoples R China
[2] Univ Newcastle, ARC Ctr Excellence Geotech Sci & Engn Civil Surve, Callaghan, NSW 2308, Australia
关键词
Failure process; Physical model test; Super pre-stressed anchor; Rock mechanics; Dynamic disaster; ENERGY-ABSORBING BOLT; COAL-MINE; ROADWAY; ROCK; FAILURE;
D O I
10.1016/j.engfailanal.2020.104833
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
With the increase in mining depths, support problems of anchor such as roof accidents and large deformation of soft rock are becoming more and more prominent. Whether the anchor is suitable for deep roadway support has been questioned. In order to explore this problem, this paper studies the ultimate support effect of super pre-stressed anchors. Based on current higher prestress support technology in mining engineering, a support scheme of super anchor is proposed and investigated. In this work, the super anchor scheme and the other two schemes were compared and analysed through a physical model test. The model's displacement data was recorded by a high-speed camera. Meanwhile, the numerical model with the same conditions is calculated. The results show that, the super anchor scheme can improve the stress distribution of the surrounding rock; and this method contributes to the optimization of the support parameters and improves the roof bearing capacity. In addition, the super anchor scheme has a smaller scope of damage than the other two schemes. Third, the super anchor scheme reduces the number of anchors without reducing the strength of the support, which is beneficial to the rapid excavation of the roadway. However, it is worth noting that, the end of the super anchor will produce significant stress concentration in the support process, and this easily leads to the separation and crack of the roof near the end of the super anchor. In short, the physical model test shows that, using super pre-stressed anchors is promising for solving the extremely difficult deep roadway support problems.
引用
收藏
页数:11
相关论文
共 50 条
  • [21] Test and study of reinforced concrete column strengthened with pre-stressed struts
    Jiang, Hua
    Cheng, Chao
    Zhongguo Tiedao Kexue/China Railway Science, 2004, 25 (01): : 105 - 109
  • [22] Design and Simulation of New Unit Earth Anchor for Pre-stressed Cementing
    Zhang Qiang
    Dong Xiao-hu
    Hu Shan-shan
    2013 INTERNATIONAL CONFERENCE ON MACHINERY, MATERIALS SCIENCE AND ENERGY ENGINEERING, 2013, 318 : 153 - 157
  • [23] Monitoring analysis of pre-stressed load of anchor cables for deep excavations
    Yang, Z.-H. (yangzhihongxyz@163.com), 1600, Chinese Society of Civil Engineering (34):
  • [24] Analytical model for reinforcement effect and load transfer of pre-stressed anchor cable with bore deviation
    Zhou, Chang
    Hu, Yuanjun
    Xiao, Ting
    Ou, Qiang
    Wang, Luqi
    CONSTRUCTION AND BUILDING MATERIALS, 2023, 379
  • [25] Key technology and application of pre-stressed anchor to improve pre-tightening force
    Hou J.
    Li C.
    Zhao N.
    Du C.
    Zhang D.
    Li P.
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2022, 50 (12): : 92 - 101
  • [26] The use of pre-stressed tendons in the Polish coal mining industry
    Rak, Zbigniew
    Stasica, Jerzy
    Stopyra, Michal
    NEW TECHNOLOGICAL SOLUTIONS IN UNDERGROUND MINING: INTERNATIONAL MINING FORUM 2006, 2006, : 49 - +
  • [27] Research and application on new high pre-stressed anchor cable with bolt-grouting comprehensive support technology
    Zhang, Hong-Jun (sduhongjun@163.com), 2017, China Coal Society (42):
  • [28] Stability Analysis of Tiered Geosynthetic Reinforced SoilWall with Pre-stressed Anchor Pile
    Lv, Peng
    Wang, Hai-long
    Yang, Guang-qing
    Liu, Wei-chao
    Wang, He
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 21 (16): : 5405 - 5419
  • [29] Design of frame supporting structure with pre-stressed anchor bars on loess slopes
    Zhu, Yan-Peng
    Zheng, Shan-Yi
    Zhang, Hong
    Yan, Ru
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2006, 28 (SUPPL.): : 1582 - 1585
  • [30] Load Transfer law of pre-stressed anchor cable within loess stratum
    Bin, Zhu
    Electronic Journal of Geotechnical Engineering, 2015, 20 (12): : 5045 - 5060