Stability Analysis During Concrete Pumping for A CFST Arch Bridge Rib

被引:0
|
作者
Chen Yanjiang [1 ]
Ren Xiaoqiang [1 ]
Wang Jinjie [1 ]
Gu Dapeng [1 ]
机构
[1] Beijing Univ Technol, Sch Architecture & Civil Engn, Beijing 100124, Peoples R China
来源
关键词
Arch Bridge; Concrete Filled Steel Tube(CFST); Concrete Pumping; Stability Analysis;
D O I
10.4028/www.scientific.net/AMR.446-449.1199
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper lists the problems during the stability analysis of long span CFST arch bridge and the corresponding modeling method. Based on the construction control of an orthotropic long span CFST arch bridge, a FEM model had been established to analysis the stability of its rib during the concrete pumping. The conclusion shows significant importance to the bridge's construction process.
引用
收藏
页码:1199 / 1202
页数:4
相关论文
共 50 条
  • [41] Parameter analysis of vehicle-bridge coupling of half through CFST arch bridge due to vehicle
    School of Automobile and Traffic Engineering, Wuhan University of Science and Technology, Wuhan, 430081, China
    不详
    Key Eng Mat, (31-41):
  • [42] Analysis of Ultimate Capacity of Prestressed Concrete Bridge with High CFST Piers
    Wang, Fang
    Zhang, Lin
    INTERNATIONAL CONFERENCE ON ENERGY DEVELOPMENT AND ENVIRONMENTAL PROTECTION (EDEP 2017), 2017, 168 : 376 - 382
  • [43] Study on loading test of the sub-arch bridge of double-decker CFST arch bridge
    Xing, Yan
    Shen, Dan
    Yu, Xiaolin
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON HEALTH MONITORING OF STRUCTURE, MATERIALS AND ENVIRONMENT, VOLS 1 AND 2, 2007, : 847 - +
  • [44] Stability analysis of double x-shape arch bridge during construction
    Jiang Ziqi
    Liu Bingwei
    2019 3RD INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2019), 2019, 267
  • [45] Simulation of girth welding seam of large diameter arch rib of concrete-filled steel tube arch bridge
    Yang Y.
    Deng N.
    Guo X.
    Hanjie Xuebao/Transactions of the China Welding Institution, 2020, 41 (10): : 79 - 86
  • [47] A Comparative Analysis of Axis Types of High-speed Railway CFST Arch Bridge
    Wei, Xing
    Ju, Yun-Hua
    Wu, Chen-Tai
    Wen, Zong-Yi
    Journal of Railway Engineering Society, 2018, 35 (03) : 45 - 51
  • [48] Stochastic seismic analysis of a CFST arch bridge under spatially varying ground motions
    Beijing Laboratory of Earthquake Engineering and Structural Retrofit, Beijing University of Technology, Beijing 100024, China
    不详
    不详
    Gongcheng Lixue, 2013, 12 (99-106):
  • [49] The analysis of double-nonlinearity stability of concrete filled steel-tube arch bridge
    Han, Xing
    Zhu, Bing
    Liu, Guiman
    Wang, Junping
    Xiang, Baoshan
    APPLIED ENERGY TECHNOLOGY, PTS 1 AND 2, 2013, 724-725 : 1709 - +
  • [50] Influence analysis of seismic traveling wave for long-span CFST arch bridge
    Wang, H. (wanghao1980@seu.edu.cn), 2012, Nanjing University of Aeronautics an Astronautics (25):