Stability Analysis During Concrete Pumping for A CFST Arch Bridge Rib

被引:0
|
作者
Chen Yanjiang [1 ]
Ren Xiaoqiang [1 ]
Wang Jinjie [1 ]
Gu Dapeng [1 ]
机构
[1] Beijing Univ Technol, Sch Architecture & Civil Engn, Beijing 100124, Peoples R China
来源
关键词
Arch Bridge; Concrete Filled Steel Tube(CFST); Concrete Pumping; Stability Analysis;
D O I
10.4028/www.scientific.net/AMR.446-449.1199
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper lists the problems during the stability analysis of long span CFST arch bridge and the corresponding modeling method. Based on the construction control of an orthotropic long span CFST arch bridge, a FEM model had been established to analysis the stability of its rib during the concrete pumping. The conclusion shows significant importance to the bridge's construction process.
引用
收藏
页码:1199 / 1202
页数:4
相关论文
共 50 条
  • [21] Recent development of the CFST arch bridge in China
    Zheng, ZF
    Chen, BC
    Wu, QX
    COMPOSITE AND HYBRID STRUCTURES, VOLS 1 AND 2, 2000, : 205 - 212
  • [22] Monitoring of a concrete arch bridge during construction
    Inaudi, D
    Rüfenacht, A
    von Arx, B
    Noher, HP
    Vurpillot, S
    Glisic, B
    SMART STRUCTURES AND MATERIALS 2002: SMART SYSTEMS FOR BRIDGES, STRUCTURES, AND HIGHWAYS, 2002, 4696 : 146 - 153
  • [23] Mechanical behavior of bolt-welded joint at arch rib of long-span CFST arch bridge under eccentric compression
    Yu P.
    Yun W.
    Zheng J.
    Yu S.
    Guo X.
    Chang Y.
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2023, 56 (12): : 122 - 131and155
  • [25] INFLUENCE OF CROSSBARS OF ARCH RIB ON STABILITY CHARACTERISTICS OF STEEL-BOX STACKED ARCH BRIDGE
    Zhang, Kun
    Lei, Junqing
    Ha, Liangqiu
    Xie, Jianguo
    NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 772 - +
  • [26] Stability analysis and wind-resistant study of CFST arch bridge being erected by integral lifting method
    Huang, Chuan-Sheng
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2007, 39 (SUPPL. 2): : 731 - 734
  • [27] Stochastic seismic analysis of a concrete-filled steel tubular (CFST) arch bridge under tridirectional multiple excitations
    Zhang, De-Yi
    Li, Xi
    Yan, Wei-Ming
    Xie, Wei-Chau
    Pandey, Mahesh D.
    ENGINEERING STRUCTURES, 2013, 52 : 355 - 371
  • [28] Fatigue Evaluation of CFST Arch Bridge Based on Vehicle-Bridge Coupling Vibration Analysis
    Hu, Wenliang
    Zhou, Bin
    Zheng, Xiaobo
    BUILDINGS, 2024, 14 (06)
  • [29] Research on Concrete Pouring Scheme for Main Arch Ring of CFST Rigid Skeleton Arch Bridge with 600 m Span
    Lin C.
    Zhu J.
    Lan J.
    Xiao Z.
    Jiang C.
    Zhongguo Tiedao Kexue/China Railway Science, 2023, 44 (01): : 125 - 133
  • [30] Dynamic characteristic analysis of the through CFST arch bridge with 100 m span
    Sun, Z
    Chen, H
    PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON EARTHQUAKE ENGINEERING: NEW FRONTIER AND RESEARCH TRANSFORMATION, 2004, : 526 - 528