共 50 条
- [41] A Proposed Method for Modeling Research and Development (R&D) Project Prioritization Criteria PROCEEDINGS OF PICMET 09 - TECHNOLOGY MANAGEMENT IN THE AGE OF FUNDAMENTAL CHANGE, VOLS 1-5, 2009, : 589 - 598
- [42] ON SUPPLIER SELECTION OF EQUIPMENT R&D PROJECT BASED ON CLOUD TOPSIS METHOD ICIM'2016: PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2016, : 161 - 168
- [43] R&D Satellite Account: a methodological proposal to Ecuador REVISTA BRASILEIRA DE INOVACAO, 2024, 23
- [45] Research on R&D process proposal in the era of convergence 2021 21ST ACIS INTERNATIONAL WINTER CONFERENCE ON SOFTWARE ENGINEERING, ARTIFICIAL INTELLIGENCE, NETWORKING AND PARALLEL/DISTRIBUTED COMPUTING (SNPD-WINTER 2021), 2021, : 153 - 155
- [49] Are R&D project termination factors universal? 1600, Industrial Research Inst Inc, Washington, DC, USA (38):