Deadline-based incentive contracts in project management with cost salience

被引:9
|
作者
Chen, Zhihua [1 ]
Lan, Yanfei [1 ,2 ]
Zhao, Ruiqing [1 ]
Shang, Changjing [2 ]
机构
[1] Tianjin Univ, Coll Management & Econ, Tianjin 300072, Peoples R China
[2] Aberystwyth Univ, Dept Comp Sci, Aberystwyth SY23 3DB, Dyfed, Wales
基金
中国国家自然科学基金;
关键词
Uncertainty theory; Incentive mechanism; Project management; Information asymmetry; Cost salience; PROCRASTINATION; COMPENSATION; PERFORMANCE; INFORMATION; IMPACTS; OPTION; MODEL;
D O I
10.1007/s10700-019-09302-y
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The contractor's procrastinating behavior owing to the psychology of cost salience exposes the project manager to the risk of time delay, which brings a significant challenge in project manager's incentive contract design. This paper considers that a project manager pays a contractor over a menu of deadline-based incentive contracts to conduct a project which consists of two sequential tasks. The contractor is endowed with private cost salience information and unobservable efforts. The subjective assessments about the cost salience degree and the project variability are characterized as uncertain variables. Within the framework of uncertainty theory and principal-agent theory, we investigate the impacts of the existence of cost salience and information asymmetry on the incentive contract and the project manager's profit. We confirm that cost salience can impel the project manager to lower both the fixed payment under full information and the penalty/incentive rate under pure moral hazard. Interestingly, we find that moral hazard can weaken the extent of inverse impact caused by the existence of cost salience for the project manager. Our study also shows that, for mitigating the adverse impacts brought by moral hazard, the project manager is more profitable to provide effort incentive when the contractor's efforts are more productive or the project risk is in a higher level. Finally, other suggestions for mitigating the detrimental impacts brought by adverse selection are provided by numerical experiments.
引用
收藏
页码:451 / 473
页数:23
相关论文
共 50 条
  • [41] The deadline: A novel about project management
    Gray, P
    INFORMATION SYSTEMS MANAGEMENT, 1998, 15 (03) : 86 - 90
  • [42] Costly verification of cost performance and the competition for incentive contracts
    Dunne, SA
    Loewenstein, MA
    RAND JOURNAL OF ECONOMICS, 1995, 26 (04): : 690 - 703
  • [43] COST PLUS INCENTIVE FEE FOR CONSTRUCTION CONTRACTS.
    O'Connor, M.J.
    Colwell, G.E.
    Technical Report - United States Army Corps of Engineers, Construction Engineering Research Laboratory, 1980, (P-118):
  • [44] INCENTIVE CONTRACTS - MANAGEMENT STRATEGY OF THE DEPARTMENT OF DEFENSE
    CARLISLE, HM
    PUBLIC ADMINISTRATION REVIEW, 1964, 24 (01) : 21 - 28
  • [45] RT-PUSH: A VM FAULT DETECTOR FOR DEADLINE-BASED TASKS IN CLOUD
    Sahoo, Sampa
    Sahoo, Bibhudatta
    Turuk, Ashok Kumar
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON COMMUNICATION AND INFORMATION PROCESSING (ICCIP 2017), 2017, : 196 - 201
  • [46] Efficient schedulability analysis for mixed-criticality systems under deadline-based scheduling
    Chen Yao
    Li Qiao
    Li Zheng
    Xiong Huagang
    CHINESE JOURNAL OF AERONAUTICS, 2014, 27 (04) : 856 - 866
  • [47] DAWN: A Density Adaptive Routing for Deadline-Based Data Collection in Vehicular Delay Tolerant Networks
    Fu, Qiao
    Krishnamachari, Bhaskar
    Zhang, Lin
    TSINGHUA SCIENCE AND TECHNOLOGY, 2013, 18 (03) : 230 - 241
  • [48] Deadline-based dynamic resource allocation and provisioning algorithms in Fog-Cloud environment
    Naha, Ranesh Kumar
    Garg, Saurabh
    Chan, Andrew
    Battula, Sudheer Kumar
    FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2020, 104 : 131 - 141
  • [49] Comparison of deadline-based scheduling algorithms for periodic real-time tasks on multiprocessor
    Park, M
    Han, S
    Kim, H
    Cho, S
    Cho, Y
    IEICE TRANSACTIONS ON INFORMATION AND SYSTEMS, 2005, E88D (03) : 658 - 661
  • [50] Deadline-based Approach for Improving Delivery of SVC-based HTTP Adaptive Streaming Content
    Bouten, Niels
    Claeys, Maxim
    Latre, Steven
    Famaey, Jeroen
    Van Leekwijck, Werner
    De Turck, Filip
    2014 IEEE NETWORK OPERATIONS AND MANAGEMENT SYMPOSIUM (NOMS), 2014,