Deadline-based incentive contracts in project management with cost salience

被引:9
|
作者
Chen, Zhihua [1 ]
Lan, Yanfei [1 ,2 ]
Zhao, Ruiqing [1 ]
Shang, Changjing [2 ]
机构
[1] Tianjin Univ, Coll Management & Econ, Tianjin 300072, Peoples R China
[2] Aberystwyth Univ, Dept Comp Sci, Aberystwyth SY23 3DB, Dyfed, Wales
基金
中国国家自然科学基金;
关键词
Uncertainty theory; Incentive mechanism; Project management; Information asymmetry; Cost salience; PROCRASTINATION; COMPENSATION; PERFORMANCE; INFORMATION; IMPACTS; OPTION; MODEL;
D O I
10.1007/s10700-019-09302-y
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The contractor's procrastinating behavior owing to the psychology of cost salience exposes the project manager to the risk of time delay, which brings a significant challenge in project manager's incentive contract design. This paper considers that a project manager pays a contractor over a menu of deadline-based incentive contracts to conduct a project which consists of two sequential tasks. The contractor is endowed with private cost salience information and unobservable efforts. The subjective assessments about the cost salience degree and the project variability are characterized as uncertain variables. Within the framework of uncertainty theory and principal-agent theory, we investigate the impacts of the existence of cost salience and information asymmetry on the incentive contract and the project manager's profit. We confirm that cost salience can impel the project manager to lower both the fixed payment under full information and the penalty/incentive rate under pure moral hazard. Interestingly, we find that moral hazard can weaken the extent of inverse impact caused by the existence of cost salience for the project manager. Our study also shows that, for mitigating the adverse impacts brought by moral hazard, the project manager is more profitable to provide effort incentive when the contractor's efforts are more productive or the project risk is in a higher level. Finally, other suggestions for mitigating the detrimental impacts brought by adverse selection are provided by numerical experiments.
引用
收藏
页码:451 / 473
页数:23
相关论文
共 50 条
  • [1] Deadline-based incentive contracts in project management with cost salience
    Zhihua Chen
    Yanfei Lan
    Ruiqing Zhao
    Changjing Shang
    Fuzzy Optimization and Decision Making, 2019, 18 : 451 - 473
  • [2] The impact of decision criteria on deadline-based incentive contracts in project management
    Jiao Wang
    Kai Yang
    Ruiqing Zhao
    Journal of Intelligent Manufacturing, 2017, 28 : 643 - 655
  • [3] The impact of decision criteria on deadline-based incentive contracts in project management
    Wang, Jiao
    Yang, Kai
    Zhao, Ruiqing
    JOURNAL OF INTELLIGENT MANUFACTURING, 2017, 28 (03) : 643 - 655
  • [4] Deadline-Based MapReduce Workload Management
    Polo, Jorda
    Becerra, Yolanda
    Carrera, David
    Steinder, Malgorzata
    Whalley, Ian
    Torres, Jordi
    Ayguade, Eduard
    IEEE TRANSACTIONS ON NETWORK AND SERVICE MANAGEMENT, 2013, 10 (02): : 231 - 244
  • [5] Deadline-based Priority Management in Cloud
    Nehru, E. Iniya
    Mukherjee, Saswati
    Kumar, Abhishek
    ARTIFICIAL INTELLIGENCE AND EVOLUTIONARY ALGORITHMS IN ENGINEERING SYSTEMS, VOL 2, 2015, 325 : 745 - 751
  • [6] Optimal Incentive Contracts in Project Management
    Dawande, Milind
    Janakiraman, Ganesh
    Qi, Anyan
    Wu, Qi
    PRODUCTION AND OPERATIONS MANAGEMENT, 2019, 28 (06) : 1431 - 1445
  • [7] Admission control in deadline-based network resource management
    Liu, YE
    Wong, JW
    CONFERENCE PROCEEDINGS OF THE 2004 IEEE INTERNATIONAL PERFORMANCE, COMPUTING, AND COMMUNICATIONS CONFERENCE, 2004, : 95 - 102
  • [8] Deadline-based workload management for MapReduce environments: Pieces of the perfromance puzzle
    University of Illinois, Urbana-Champaign, IL, United States
    不详
    HP Lab Tech Rep, 2012, 82
  • [9] Equivalence between Separate and Synthesized EVM Based Incentive Contracts in Project Management
    Dai Chun'ai
    Tang Xiaowo
    PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 1856 - 1860
  • [10] Deadline-based Workload Management for MapReduce Environments: Pieces of the Performance Puzzle
    Verma, Abhishek
    Cherkasova, Ludmila
    Kumar, Vijay S.
    Campbell, Roy H.
    2012 IEEE NETWORK OPERATIONS AND MANAGEMENT SYMPOSIUM (NOMS), 2012, : 900 - 905