共 50 条
- [41] Simulation for Effective Shop-Floor Decision Making: A Case Study ADVANCES IN INDUSTRIAL AND PRODUCTION ENGINEERING, 2019, : 673 - 681
- [45] GPGP coordination mechanisms application in shop-floor scheduling systems based on MAS Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2001, 37 (08): : 80 - 83
- [46] Manufacturing Execution Systems: The Next Level of Automated Control or of Shop-Floor Support? ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: SMART MANUFACTURING FOR INDUSTRY 4.0, APMS 2018, 2018, 536 : 386 - 393
- [48] A modeling strategy of shop-floor interlocking and controlling using virtual Petri Nets and production simulation 2006 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-6, PROCEEDINGS, 2006, : 4084 - +
- [50] COMPUTER-AIDED SHOP FLOOR SCHEDULING FOR BATCH PRODUCTION MACHINERY AND PRODUCTION ENGINEERING, 1970, 117 (3022): : 614 - &