Shop-floor scheduling on the batch manufacturing process using ARENA simulation

被引:0
|
作者
Tipi, NS [1 ]
Bennett, S [1 ]
机构
[1] Univ Sheffield, Dept Automat Control & Syst Engn, Sheffield S1 3JD, S Yorkshire, England
关键词
dispatching rules; scheduling; discrete-event; simulation; ARENA;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
In the manufacturing industry production scheduling is one of the most important planning and scheduling issues. Simulation can help to improve the operation of manufacturing systems. In this paper we present a simulation approach on dynamic and stochastic scheduling using ARENA software. The problem studied is a system with two stations each with multiple parallel machines. The objectives of this study are to analyse the system behaviour in order to meet the following measure of performance minimum mean flow-time, maximum throughput, minimum WIP, maximum per cent for machine utilisation and minimum make-span. Five dispatching rules were implemented for scheduling.
引用
收藏
页码:540 / 542
页数:3
相关论文
共 50 条
  • [31] Shop-floor scheduling as a competitive advantage: A study on the relevance of cyber-physical systems in different manufacturing contexts
    Romero-Silva, Rodrigo
    Hernandez-Lopez, Gabriel
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2020, 224
  • [32] Collaborative Scheduling of Production and Transportation in the Shop-Floor Based on Digital Twin
    Xiong, Xiaozheng
    Xu, Wenjun
    Liu, Jiayi
    Hu, Yang
    2022 IEEE 17TH CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (ICIEA), 2022, : 620 - 626
  • [33] Distributed initiative and collaborative manufacturing: new paradigm for intelligent shop-floor
    Zhuang C.
    Liu J.
    Xiong H.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (08): : 1865 - 1874
  • [34] Development of multi-level adaptive control and scheduling solutions for shop-floor automation in reconfigurable manufacturing systems
    Valente, A.
    Carpanzano, E.
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2011, 60 (01) : 449 - 452
  • [35] An example of a shop-floor control system application in a Polish manufacturing company
    ITMiA, Wroclaw, Poland
    不详
    不详
    Hum Syst Manage, 3-4 (245-252):
  • [36] Timing constraints' optimization of reserved tasks in the distributed shop-floor scheduling
    Lee, S
    Jung, MY
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (02) : 397 - 410
  • [37] SHOP-FLOOR CONTROL AND TOOL LOADING POLICIES IN FLEXIBLE MANUFACTURING SYSTEMS
    HEDIN, SR
    MALHOTRA, MK
    PHILIPOOM, PR
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (11) : 2495 - 2512
  • [38] An example of a shop-floor control system application in a Polish manufacturing company
    Chrobot, Jaroslaw
    Klukowski, Andrzej
    Koch, Jan
    Rakowski, Jaroslaw
    Smalec, Zbigniew
    Weiner, Markus
    Human Systems Management, 1999, 18 (3-4): : 245 - 252
  • [39] Digital Twin-based Production Simulation of Discrete Manufacturing Shop-floor for Onsite Performance Analysis
    Zhang, Y. F.
    Shao, Y. Q.
    Wang, J. F.
    Li, S. Q.
    2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 1107 - 1111
  • [40] A simulation framework for the performance assessment of shop-floor control systems
    Mönch, L
    Rose, O
    Sturm, R
    SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2003, 79 (03): : 163 - 170