Spudcans as foundations for offshore jack-up rigs - Problems and calculation methods

被引:1
|
作者
Henke, Sascha [1 ]
Qiu, Gang [1 ]
Pucker, Tim [1 ]
机构
[1] Tech Univ Hamburg, Inst Geotech & Baubetrieb, D-21073 Hamburg, Germany
关键词
spudcans; offshore; foundation; bearing capacity; design; jack-up rig; SAND OVERLYING CLAY; BEARING CAPACITY; PENETRATION; SOILS; MODEL;
D O I
10.1002/bate.201200047
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Spudcans as foundations for offshore jack-up rigs - Problems and calculation methods For the installation of wind parks jack-up rigs can be used. Jack-up rigs are founded on the seabed before start of operation to receive sufficient stability and to reduce wave induced influences. One possible foundation for jack-up rigs on the seabed is the so-called spudcan. A spudcan is a circular foundation attached to the legs of the jack-up rig to transfer the vertical loads into the ground. The use of spudcan-foundations is state-of-the-art in the oil- and gas industry. Nevertheless, the design of this type of foundation is still challenging. For example, the correct determination of the load-settlement-response with respect to different soil conditions is complex and the definition of the safe side is not always clear. Another problem related to the spudcan depositioning onto layered soil is the so-called punch-through-failure. This means that during installation onto dense sand overlying weak clay the spudcan may suddenly punch through the sand layer into the weaker layer. This can even lead to a total loss of the jack-up rig. In this contribution, different methods for spudcan design recommended in literature and international guidelines are summarized. Furthermore, open questions and results of ongoing research are discussed to give the reader an impression of the capabilities and the difficulties regarding spudcan foundations.
引用
收藏
页码:831 / 840
页数:10
相关论文
共 50 条
  • [21] RPD Analysis of Jack-Up Rigs using 3D Models
    Chakrabarti, Partha
    Chawan, Abhijeet
    33rd International Conference on Ocean, Offshore and Arctic Engineering, 2014, Vol 1A, 2014,
  • [22] Influence of base suction on extraction of jack-up spudcans (vol 55, pg 741, 2005
    Purwana, OA
    Leung, CF
    Chow, YK
    Foo, KS
    GEOTECHNIQUE, 2006, 56 (04): : 287 - 288
  • [23] EXPERIMENTAL STUDY ON THE STABILITY OF JACK-UP RIG FOUNDATIONS.
    Hattori, Youichi
    Ushio, Masayuki
    Nanjo, Masahiro
    Kawamura, Taizo
    Hitachi Zosen Technical Review, 1985, 46 (04): : 12 - 18
  • [24] JACK-UP UNIT SAVES OFFSHORE CONSTRUCTION TIME.
    Kennedy, John L., 1600, (71):
  • [25] Analysis of Free Vibrations of Three-legged Jack-up Offshore Drilling Rigs with Considerstion of Elastic Soil Foundation.
    Lalin, V.V.
    Smelov, V.A.
    Trudy LPI, 1985, (405): : 59 - 64
  • [26] Topology optimization of jack-up offshore platform leg structure
    Deng, Wei
    Tian, Xiaojie
    Han, Xiangyu
    Liu, Guijie
    Xie, Yingchun
    Li, Zhixiong
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART M-JOURNAL OF ENGINEERING FOR THE MARITIME ENVIRONMENT, 2021, 235 (01) : 165 - 175
  • [27] EXPERIMENTAL ASSESSMENT OF THE OFFSHORE LAUNCHING OPERATION OF A JACK-UP UNIT
    Rodriguez, Claudio A.
    Esperanca, Paulo T. T.
    Moura, Mario
    Raigorodsky, Jacques
    33RD INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2014, VOL 1B, 2014,
  • [28] EVOLUTION OF THE DESIGN OF A JACK-UP TYPE OFFSHORE STRUCTURE.
    Giblon, R.P.
    Minorsky, V.U.
    Marine Technology, 1975, 12 (01) : 50 - 59
  • [29] Global Structural Behavior and Leg Strength for Jack-Up Rigs with Varying Environmental Parameters
    Yi, Myung-Su
    Park, Joo-Shin
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2023, 11 (02)
  • [30] ULTIMATE STRENGTH OF JACK-UP RIGS IN SURVIVAL AND PUNCH-THROUGH CONDITIONS.
    Ueda, Yukio
    Rashed, Sherif M.H.
    Ishihama, Takaaki
    Nakacho, Keiji
    Transactions of J W R I, 1987, 16 (02): : 165 - 175