A Typology Model of Temporary Facility Constraints for Automated Construction Site Layout Planning

被引:13
|
作者
Kim, Minguk [1 ]
Ryu, Han-Guk [2 ]
Kim, Tae Wan [1 ]
机构
[1] Incheon Natl Univ, Div Architecture & Urban Design, 119 Acad Ro, Incheon 22012, South Korea
[2] Sahmyook Univ, Dept Architecture, Seoul 01795, South Korea
来源
APPLIED SCIENCES-BASEL | 2021年 / 11卷 / 03期
关键词
constraint; typology model; construction site; site layout planning; temporary facility; GENETIC ALGORITHMS; DYNAMIC LAYOUT; OPTIMIZATION; SAFETY;
D O I
10.3390/app11031027
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
This study sought to develop a typology model of temporary facility constraints that can be used practically in construction site layout planning (CSLP) automation models. A triangulated methodology (literature review, in-depth interviews, and actual case studies) was used to identify constraints of 11 temporary facilities that are considered mainly in CSLP and to classify them into six constraint types (i.e., dimensional, regional, relocation, non-overlap, inter-facility distance, and visibility constraints) and seven subtypes. In addition, this study proposed computational modeling methods that would allow a computer to judge whether or not the constraints are met by a created construction site layout. This study contributes to CSLP theory by providing a typology model of temporary facilities that can be used in the model-based verification of the created construction site layout and constraint processing condition in CSLP optimization models. This would also help provide efficient, safe, and eco-friendly construction site management, while refraining from experience- and intuition-centered CSLP practices.
引用
收藏
页码:1 / 21
页数:22
相关论文
共 50 条
  • [31] Study on programming of subway station construction site based on dynamic site layout planning
    Ji, Hongqi
    Zhou, Jiaqing
    Li, Lei
    Shi, Chenghua
    Lei, Tao
    Journal of Railway Science and Engineering, 2020, 17 (07) : 1865 - 1873
  • [32] Analytic Network Process-Based Multi-Criteria Decision Approach and Sensitivity Analysis for Temporary Facility Layout Planning in Construction Projects
    Jin, Haifeng
    Zhang, Mingyuan
    Yuan, Yongbo
    APPLIED SCIENCES-BASEL, 2018, 8 (12):
  • [33] Dynamic construction site layout planning: an application of branch and bond algorithm
    Sing, Michael C. P.
    Fung, Ivan W. H.
    Edwards, David John
    Liu, Henry
    INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2022, 40 (04) : 523 - 538
  • [34] Conjoining MMAS to GA to Solve Construction Site Layout Planning Problem
    Lam, Ka-Chi
    Ning, Xin
    Lam, Mike Chun-Kit
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (10) : 1049 - 1057
  • [35] Optimization algorithms for construction site layout planning: a systematic literature review
    Xu, Maozeng
    Mei, Zhongya
    Luo, Siyu
    Tan, Yi
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (08) : 1913 - 1938
  • [36] A hybrid AI-based system for site layout planning in construction
    Elbeltagi, E
    Hegazy, T
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2001, 16 (02) : 79 - 93
  • [37] Physics-inspired Metaheuristics for Construction Site Layout Planning Problem
    Kaveh, Ali
    Javid, Ali Akbar Shirzadi
    Vazirinia, Yasin
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2024, 68 (01): : 68 - 87
  • [38] Using Biological Knowledge for Layout Optimization of Construction Site Temporary Facilities: A Case Study
    Prayogo, Doddy
    INTERNATIONAL CONFERENCE ON SUSTAINABLE CIVIL ENGINEERING STRUCTURES AND CONSTRUCTION MATERIALS (SCESCM 2018), 2019, 258
  • [39] A tri-objective ant colony optimization based model for planning safe construction site layout
    Ning, Xin
    Qi, Jingyan
    Wu, Chunlin
    Wang, Wenjuan
    AUTOMATION IN CONSTRUCTION, 2018, 89 : 1 - 12
  • [40] A generative design-based optimization model for multi-objective construction site layout planning
    Wefki, Hossam
    Salah, Mona
    Elbeltagi, Emad
    Elsheikh, Asser
    Khallaf, Rana
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,