A Typology Model of Temporary Facility Constraints for Automated Construction Site Layout Planning

被引:13
|
作者
Kim, Minguk [1 ]
Ryu, Han-Guk [2 ]
Kim, Tae Wan [1 ]
机构
[1] Incheon Natl Univ, Div Architecture & Urban Design, 119 Acad Ro, Incheon 22012, South Korea
[2] Sahmyook Univ, Dept Architecture, Seoul 01795, South Korea
来源
APPLIED SCIENCES-BASEL | 2021年 / 11卷 / 03期
关键词
constraint; typology model; construction site; site layout planning; temporary facility; GENETIC ALGORITHMS; DYNAMIC LAYOUT; OPTIMIZATION; SAFETY;
D O I
10.3390/app11031027
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
This study sought to develop a typology model of temporary facility constraints that can be used practically in construction site layout planning (CSLP) automation models. A triangulated methodology (literature review, in-depth interviews, and actual case studies) was used to identify constraints of 11 temporary facilities that are considered mainly in CSLP and to classify them into six constraint types (i.e., dimensional, regional, relocation, non-overlap, inter-facility distance, and visibility constraints) and seven subtypes. In addition, this study proposed computational modeling methods that would allow a computer to judge whether or not the constraints are met by a created construction site layout. This study contributes to CSLP theory by providing a typology model of temporary facilities that can be used in the model-based verification of the created construction site layout and constraint processing condition in CSLP optimization models. This would also help provide efficient, safe, and eco-friendly construction site management, while refraining from experience- and intuition-centered CSLP practices.
引用
收藏
页码:1 / 21
页数:22
相关论文
共 50 条
  • [21] A hybrid simulation approach for site layout planning in construction projects
    Taghaddos, Hosein
    Heydari, Mohammad Hosein
    Asgari, AmirHosein
    CONSTRUCTION INNOVATION-ENGLAND, 2021, 21 (03): : 417 - 440
  • [22] Multistakeholder Conflict Minimization-Based Layout Planning of Construction Temporary Facilities
    Song, Xiaoling
    Zhong, Lin
    Zhang, Zhe
    Xu, Jiuping
    Shen, Charles
    Pena-Mora, Feniosky
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2018, 32 (02)
  • [23] Applying rule-based model-checking to construction site layout planning tasks
    Schwabe, Kevin
    Teizer, Jochen
    Koenig, Markus
    AUTOMATION IN CONSTRUCTION, 2019, 97 : 205 - 219
  • [24] Site layout planning for prefabricated components subject to dynamic and interactive constraints
    Zhang, Hong
    Yu, Lu
    AUTOMATION IN CONSTRUCTION, 2021, 126
  • [25] Efficient facility layout planning in a maximally planar graph model
    Pesch, E
    Glover, F
    Bartsch, T
    Salewski, F
    Osman, I
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (02) : 263 - 283
  • [26] A Decision Making System for Construction Temporary Facilities Layout Planning in Large-Scale Construction Projects
    Song, Xiaoling
    Xu, Jiuping
    Shen, Charles
    Pena-Mora, Feniosky
    Zeng, Ziqiang
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2017, 15 (2A) : 333 - 353
  • [27] A Decision Making System for Construction Temporary Facilities Layout Planning in Large-Scale Construction Projects
    Xiaoling Song
    Jiuping Xu
    Charles Shen
    Feniosky Peña-Mora
    Ziqiang Zeng
    International Journal of Civil Engineering, 2017, 15 : 333 - 353
  • [28] Conflicts resolution based construction temporary facilities layout planning in large-scale construction projects
    Song, Xiaoling
    Xu, Jiuping
    Shen, Charles
    Pena-Mora, Feniosky
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2016, 43 (09) : 783 - 801
  • [29] Automated planning support for on-site construction inspection
    Gordon, Chris
    Akinci, Burcu
    Garrett, James H., Jr.
    AUTOMATION IN CONSTRUCTION, 2008, 17 (06) : 705 - 718
  • [30] New mathematical optimization model for construction site layout
    Easa, Said M.
    Hossain, K. M. A.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2008, 134 (08): : 653 - 662