Research on the Model of Early-warning of Logistics Outsourcing Risks Based on Four Phases

被引:0
|
作者
Sun, Jiaqing [1 ]
Zheng, Han [2 ]
机构
[1] Dalian Maritime Univ, Coll Transportat Management, Dalian 116026, Peoples R China
[2] Shanghai Baoshan Iron & Steel Co Ltd, Transportat Dept, Shanghai 201900, Peoples R China
基金
中国国家自然科学基金;
关键词
logistics outsourcing; early-warning of risks; four phases; factor analysis method; fuzzy comprehensive evaluation method;
D O I
暂无
中图分类号
TN [电子技术、通信技术];
学科分类号
0809 ;
摘要
Along with bringing the enterprises competitiveness and beneficial advantages, logistics outsourcing also brings them a variety of risks. The risks of logistics outsourcing are caused by many factors which also have their own fuzziness. Based on the characteristics of logistics outsourcing risks, the model of early-warning of logistics outsourcing risks based on four phases is established: Firstly, identify the principle and early-warning line; secondly, use the software SPSS and factor analysis method to identify the outsourcing risks and ascertain key risk factors; thirdly, evaluate key risk factors using fuzzy comprehensive evaluation method; fourthly, based on the evaluation of risks, use weighted average method to determine the level of risk, meanwhile compare with the principle and early-warning line and further ascertain the alarming and beforehand control. Finally, an example using this model shows that the model is easy to operate, practical and feasible.
引用
收藏
页码:10615 / +
页数:2
相关论文
共 50 条
  • [31] Early Warning System of Reverse Logistics Outsourcing in Risk Based on BP Neural Networks
    Yu Wan
    Yan Bo
    Tan Qing
    PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 314 - 318
  • [32] Research on Technology Early-Warning System Based on Dynamic Information Monitoring
    汪雪锋
    朱东华
    刘嵩
    刘佳
    Journal of Beijing Institute of Technology, 2009, 18 (01) : 121 - 126
  • [33] Research on Architecture Modeling of the Strategic Early-warning System Based on DoDAF
    Wang, Junxiang
    Zou, Jie
    Yang, Feng
    Pan, Quan
    2013 32ND CHINESE CONTROL CONFERENCE (CCC), 2013, : 8681 - 8686
  • [34] The Research on Early-Warning of Supply Chain Risk Based on Food Safety
    Xiao Jing
    Ma Zhongsu
    Zhang Dongjie
    ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 1032 - 1037
  • [35] Research on technology early-warning system based on dynamic information monitoring
    Wang, Xue-Feng
    Zhu, Dong-Hua
    Liu, Song
    Liu, Jia
    Journal of Beijing Institute of Technology (English Edition), 2009, 18 (01): : 121 - 126
  • [36] Early-warning management of inner logistics risk in SMEs based on label-card system
    Xie, Kefan
    Liu, Jieming
    Peng, Huatao
    Chen, Gang
    Chen, Yun
    PRODUCTION PLANNING & CONTROL, 2009, 20 (04) : 306 - 319
  • [37] Construction of the Early-warning Index System for the Risk of the International Logistics Operation
    Zhang, Guohua
    Yuan, Jiali
    2ND IEEE INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER CONTROL (ICACC 2010), VOL. 5, 2010, : 209 - 213
  • [38] Research on the Financial Risk Transfer and Early-warning Model of Freight Forwarding Enterprises
    Shi Yourong
    Qiu Qingyuan
    PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I AND II, 2009, : 889 - 893
  • [39] Repast modeling simulation for national energy security early-warning - Early-warning paradigm based on CAS
    Fang Shuqiong
    Yang Baoan
    Yu Yin
    TIRMDCM 2007: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON TECHNOLOGY INNOVATION, RISK MANAGEMENT AND SUPPLY CHAIN MANAGEMENT, VOLS 1 AND 2, 2007, : 333 - 340
  • [40] Early-warning index for dam service behavior based on POT model
    Su, Huai-Zhi
    Wang, Feng
    Liu, Hong-Ping
    Shuili Xuebao/Journal of Hydraulic Engineering, 2012, 43 (08): : 974 - 978