Research on the Model of Early-warning of Logistics Outsourcing Risks Based on Four Phases

被引:0
|
作者
Sun, Jiaqing [1 ]
Zheng, Han [2 ]
机构
[1] Dalian Maritime Univ, Coll Transportat Management, Dalian 116026, Peoples R China
[2] Shanghai Baoshan Iron & Steel Co Ltd, Transportat Dept, Shanghai 201900, Peoples R China
基金
中国国家自然科学基金;
关键词
logistics outsourcing; early-warning of risks; four phases; factor analysis method; fuzzy comprehensive evaluation method;
D O I
暂无
中图分类号
TN [电子技术、通信技术];
学科分类号
0809 ;
摘要
Along with bringing the enterprises competitiveness and beneficial advantages, logistics outsourcing also brings them a variety of risks. The risks of logistics outsourcing are caused by many factors which also have their own fuzziness. Based on the characteristics of logistics outsourcing risks, the model of early-warning of logistics outsourcing risks based on four phases is established: Firstly, identify the principle and early-warning line; secondly, use the software SPSS and factor analysis method to identify the outsourcing risks and ascertain key risk factors; thirdly, evaluate key risk factors using fuzzy comprehensive evaluation method; fourthly, based on the evaluation of risks, use weighted average method to determine the level of risk, meanwhile compare with the principle and early-warning line and further ascertain the alarming and beforehand control. Finally, an example using this model shows that the model is easy to operate, practical and feasible.
引用
收藏
页码:10615 / +
页数:2
相关论文
共 50 条
  • [21] Research on Analysis and Control of Enterprise Logistics Outsourcing Risks
    Zhou Li-jun
    2012 INTERNATIONAL CONFERENCE ON FUTURE ELECTRICAL POWER AND ENERGY SYSTEM, PT B, 2012, 17 : 1268 - 1273
  • [22] Research on early-warning management model proposal of urban emergency for government
    Zhu Jiangbin
    Wang Chao
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS I AND II, 2007, : 2640 - 2644
  • [23] An early-warning model for online learners based on user portrait
    Sun Y.
    Chai R.
    Ingenierie des Systemes d'Information, 2020, 25 (04): : 535 - 541
  • [24] Research on Risk Early-warning in the Supply Chain
    Cao, Jing
    Chen, Jingying
    Liu, Jiaguo
    PROCEEDINGS OF ISCRAM CHINA 2010: FOURTH INTERNATIONAL CONFERENCE ON INFORMATION SYSTEMS FOR CRISIS RESPONSE AND MANAGEMENT, 2010, : 102 - 107
  • [25] Research on meteorological early-warning model of landslides in Wenchuan earthquake area based on machine learning
    Huang L.
    Huang, Lu (huanglu213@163.com), 1600, SinoMaps Press (49): : 267
  • [26] Research on marketing risk early-warning system based on FA-BP evaluation model
    Li Jun
    Ren Ming
    Zhang Yunqi
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PROCEEDINGS, 2007, : 148 - +
  • [27] Early-warning of engineering-project risk model research based on maximum entropy clustering
    School of Economics and Management, Beijing University of Aeronautics and Astronautics, Beijing 100191, China
    Beijing Hangkong Hangtian Daxue Xuebao, 2008, 7 (812-815):
  • [28] Research of Financial Early-Warning Model on Evolutionary Support Vector Machines Based on Genetic Algorithms
    Zhang, Zuoquan
    Lang, Fan
    Zhao, Qin
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2009, 2009
  • [29] A Financial Early-Warning Research of Listed Companies Based on Bayesian Discrimination
    Jiang, Lingmin
    INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 2563 - 2567
  • [30] Early-Warning Model Research of Slope Stress Monitoring System Based on Cusp Catastrophe Theory
    Wang Jun
    Zhou Jie
    Zhang Jianping
    PROCEEDINGS OF 2015 INTERNATIONAL SYMPOSIUM - SAFETY AND HIGH EFFICIENCY MINING IN COAL, 2015, : 370 - 377