Construction claims and disputes: Causes and cost/time overruns - Discussion

被引:0
|
作者
McDonald, DF
机构
[1] Construction Performance Specialists, Inc., Tyler, TX, 75711-7996
关键词
D O I
10.1061/(ASCE)0733-9364(1996)122:2(197.2)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
[No abstract available]
引用
收藏
页码:197 / 198
页数:2
相关论文
共 50 条
  • [11] Factors influencing Time and Cost Overruns on Freeform Construction Projects
    Kavuma, Andrew
    Ock, Jongho
    Jang, Hyounseung
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (04) : 1442 - 1450
  • [12] Time and cost overruns in the UAE construction industry: a critical analysis
    Johnson, Reshma Mary
    Babu, Robin Itty Ipe
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (05) : 402 - 411
  • [13] Factors influencing Time and Cost Overruns on Freeform Construction Projects
    Andrew Kavuma
    Jongho Ock
    Hyounseung Jang
    KSCE Journal of Civil Engineering, 2019, 23 : 1442 - 1450
  • [14] ANALYSIS AND DEVELOPMENT OF A MODEL FOR THE CAUSES OF COST AND TIME OVERRUNS IN ENGINEERING PROJECTS
    Masood, Syed Athar
    2012 ASEE ANNUAL CONFERENCE, 2012,
  • [15] Investigation into the Causes of Delays and Cost Overruns in Uganda's Public Sector Construction Projects
    Alinaitwe, Henry
    Apolot, Ruth
    Tindiwensi, Dan
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2013, 18 (02) : 33 - 47
  • [16] Causes of cost overruns in building construction projects in Asian countries; Iran as a case study
    Amini, Shima
    Rezvani, Alireza
    Tabassi, Mohsen
    Sadati, Seyed Saeed Malek
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (07) : 2739 - 2766
  • [17] New resolutions for construction claims and their disputes
    Chen, S.
    Wang, J.C.
    Wu, J.M.
    Chongqing Jianzhu Daxue Xuebao/Journal of Chongqing Jianzhu University, 2001, 23 (04):
  • [18] Modeling the Causes and Mitigation Measures for Cost Overruns in Building Construction: The Case of Higher Education Projects
    Alhammadi, Yasir
    Al-Mohammad, Mohammad S.
    Rahman, Rahimi A.
    BUILDINGS, 2024, 14 (02)
  • [19] The architect's liability for construction cost overruns
    Sabo and Zahn, Chicago, IL
    不详
    Constr Specifier, 2006, 3 (22-23):
  • [20] Time overruns in the construction projects in Iraq: Case study on investigating and analyzing the root causes
    Al Kulabi, Ahmed Kamil
    Atiea, Huda M. Jawad
    OPEN ENGINEERING, 2022, 12 (01): : 702 - 715