The architect's liability for construction cost overruns

被引:0
|
作者
Sabo and Zahn, Chicago, IL [1 ]
不详 [2 ]
机构
来源
Constr Specifier | 2006年 / 3卷 / 22-23期
关键词
Architecture - Construction industry - Contracts - Personnel - Project management;
D O I
暂无
中图分类号
学科分类号
摘要
The standard form of agreement between the owner and architect, which attempts to address the concern of cost overruns of a construction, are discussed. The agreement states that if the cost of the work exceeded the lowest bonafide bid, then the owner would give a written approval of an increase in the budget of the project and authorize rebuilding of the project within a reasonable time. The basic concept of the agreement is that, if the the cost of the project goes up too high then the architect must redesign the work without taking fees. It is recommended that the two parties should be familiar with the contract, and if any unexpected events occur, then the contract should be reviewed.
引用
收藏
相关论文
共 50 条
  • [1] CONSTRUCTION CLAIMS AND DISPUTES - CAUSES AND COST/TIME OVERRUNS
    SEMPLE, C
    HARTMAN, FT
    JERGEAS, G
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1994, 120 (04): : 785 - 795
  • [2] Theoretical framework of the causes of construction time and cost overruns
    Ullah, K.
    Abdullah, A. H.
    Nagapan, S.
    Suhoo, S.
    Khan, M. S.
    GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING 2017 (GCOMSE2017), 2017, 271
  • [3] Dealing with construction cost overruns using data mining
    Ahiaga-Dagbui, Dominic D.
    Smith, Simon D.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2014, 32 (7-8) : 682 - 694
  • [4] Rethinking construction cost overruns: cognition, learning and estimation
    Ahiaga-Dagbui, Dominic
    Smith, Simon
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2014, 19 (01) : 38 - +
  • [5] A framework for avoiding cost overruns in Malaysian construction projects
    Ullah, Kaleem
    Abdullah, Abd Halid
    Nagapan, Sasitharan
    INTERNATIONAL JOURNAL OF ADVANCED AND APPLIED SCIENCES, 2016, 3 (03): : 28 - 31
  • [6] Construction claims and disputes: causes and cost/time overruns
    Semple, Cheryl
    Hartman, Francis T.
    Jergeas, George
    Journal of Construction Engineering and Management, 1994, 120 (04) : 785 - 795
  • [7] Investigation into the Causes of Delays and Cost Overruns in Uganda's Public Sector Construction Projects
    Alinaitwe, Henry
    Apolot, Ruth
    Tindiwensi, Dan
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2013, 18 (02) : 33 - 47
  • [8] Review of construction journals on causes of project cost overruns
    Durdyev, Serdar
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (04) : 1241 - 1260
  • [9] Black Swans - are Cost Overruns on Construction Projects avoidable?
    Girmscheid, Gerhard
    BAUINGENIEUR, 2013, 88 : A3 - A3
  • [10] Delays and cost overruns in the construction projects in the Gaza Strip
    Enshassi, Adnan
    Al-Najjar, Jomah
    Kumaraswamy, Mohan
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2009, 14 (02) : 126 - +