The architect's liability for construction cost overruns

被引:0
|
作者
Sabo and Zahn, Chicago, IL [1 ]
不详 [2 ]
机构
来源
Constr Specifier | 2006年 / 3卷 / 22-23期
关键词
Architecture - Construction industry - Contracts - Personnel - Project management;
D O I
暂无
中图分类号
学科分类号
摘要
The standard form of agreement between the owner and architect, which attempts to address the concern of cost overruns of a construction, are discussed. The agreement states that if the cost of the work exceeded the lowest bonafide bid, then the owner would give a written approval of an increase in the budget of the project and authorize rebuilding of the project within a reasonable time. The basic concept of the agreement is that, if the the cost of the project goes up too high then the architect must redesign the work without taking fees. It is recommended that the two parties should be familiar with the contract, and if any unexpected events occur, then the contract should be reviewed.
引用
收藏
相关论文
共 50 条
  • [41] An analytical approach to understanding construction cost overruns during COVID-19
    Adepu, Nikhitha
    Kermanshachi, Sharareh
    Pamidimukkala, Apurva
    Nwakpuda, Emily
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2024,
  • [42] Smectites: The key to the cost overruns in the construction of the third set of locks of the Panama Canal
    Suarez, Mercedes
    Garcia-Romero, Emilia
    Baz, Ascension
    Perez, Rafael
    ENGINEERING GEOLOGY, 2021, 284
  • [43] Analysis of delays and cost overruns of road construction projects in the Colombian Caribbean Region
    Canales, Fausto A.
    Mora, Otto
    Arrieta-Castro, Marco
    Moreno-Natera, Anibal
    del Savio, Alexandre
    BULLETIN OF GEOGRAPHY-SOCIO-ECONOMIC SERIES, 2023, 61 (61) : 59 - 70
  • [44] AGREE TO A CONSTRUCTION COST, AND PAY THE PRICE OF LIABILITY
    FORSTER, JF
    CONSULTING ENGINEER, 1984, 62 (05): : 30 - &
  • [45] Cost overruns and financial risk in the construction of nuclear power reactors: A critical appraisal
    Gilbert, Alexander
    Sovacool, Benjamin K.
    Johnstone, Phil
    Stirling, Andy
    ENERGY POLICY, 2017, 102 : 644 - 649
  • [46] LIABILITY - ARCHITECT OR ENGINEER
    GOLDBLOOM, J
    CIVIL ENGINEERING, 1990, 60 (07): : 31 - &
  • [47] DEVELOPMENT COST - DETERMINANTS AND OVERRUNS
    SCHNEE, JE
    JOURNAL OF BUSINESS, 1972, 45 (03): : 347 - 374
  • [48] BALANCED VIEW OF COST OVERRUNS
    NOVICK, D
    BUSINESS HORIZONS, 1970, 13 (02) : 70 - 77
  • [49] CUTTING THOSE COST OVERRUNS
    SEAMANS, RC
    ASTRONAUTICS & AERONAUTICS, 1970, 8 (03): : 24 - &
  • [50] MASS TRANSIT COST OVERRUNS
    STOUT, RW
    CIVIL ENGINEERING, 1985, 55 (02): : 24 - &