Continuous advance - developments for a new Herrenknecht TBM

被引:0
|
作者
Troendle, J. [1 ]
Wehrmeyer, G. [1 ]
Steiner, F. [1 ]
机构
[1] Herrenknecht AG, Schwanau, Germany
关键词
D O I
10.1201/9781003348030-308
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Conventional mechanized tunnelling is separated into two consecutive process steps, the advance and ring building. In the past it was not possible to run both processes in parallel. During ring building the machine is stopped, so ring building is associated with a loss of time for the advance. To increase the efficiency of the tunnel excavation process, the machine is equipped with a system for continuous mining. The two process steps can be carried out at the same time, which improves overall performance and reduces project runtime and thereby the cost of the project. The continuous advance increases the total daily advance rate by a factor of up to 1.6 compared to the discontinuous state-of-the-art advance, resulting in a significant reduction in construction time especially for longer tunnels. In addition, higher system performance and utilization increases energy and resource efficiency, so the environmental impact is significantly reduced.
引用
收藏
页码:2560 / 2564
页数:5
相关论文
共 50 条
  • [41] Research on the Technologies of the TBM Continuous Mining Method
    Ye, Lei
    Zheng, Bo
    Zhan, Chenfei
    Chen, Kunpeng
    Wu, Thomas
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2022, (144): : 23 - 27
  • [42] A TBM advance rate prediction method considering the effects of operating factors
    Jing, Liu-jie
    Li, Jian-bin
    Zhang, Na
    Chen, Shuai
    Yang, Chen
    Cao, Hong-bo
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 107
  • [43] Subsea pipeline developments advance operations, integrity
    Smith, Christopher E.
    OIL & GAS JOURNAL, 2009, 107 (24) : 68 - 71
  • [44] Developments advance subsea pipelaying, inspection, repair
    不详
    OIL & GAS JOURNAL, 1997, 95 (37) : 57 - 59
  • [45] Continuous developments to feinroast
    Loeffler, Von Frank
    FLEISCHWIRTSCHAFT, 2008, 88 (09): : 60 - 61
  • [46] New developments in continuous process used for production of viscose industrial thread
    Baksheev, I.P.
    Butyagin, R.A.
    Yakobuk, A.A.
    Kuzubov, O.A.
    Khimicheskie Volokna, 2001, (02): : 61 - 64
  • [47] New developments in high-level continuous systems simulation languages
    Huntsinger, RC
    System Simulation and Scientific Computing, Vols 1 and 2, Proceedings, 2005, : A41 - A48
  • [48] Application of several optimization techniques for estimating TBM advance rate in granitic rocks
    Armaghani, Danial Jahed
    Koopialipoor, Mohammadreza
    Marto, Aminaton
    Yagiz, Saffet
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2019, 11 (04) : 779 - 789
  • [49] Predicting advance rate and cutter life in TBM tunnelling using evolutionary algorithm
    Sahinoglu, Ulku Kalayci
    Karakus, Murat
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2024, 38 (05) : 390 - 406
  • [50] Weighted random forest prediction model for TBM advance rate considering uncertainty
    Yan C.
    Gao Z.
    Yao X.
    Wang H.
    Yang F.
    Yang J.
    Lu G.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2023, 45 (12): : 2575 - 2583