Continuous advance - developments for a new Herrenknecht TBM

被引:0
|
作者
Troendle, J. [1 ]
Wehrmeyer, G. [1 ]
Steiner, F. [1 ]
机构
[1] Herrenknecht AG, Schwanau, Germany
关键词
D O I
10.1201/9781003348030-308
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Conventional mechanized tunnelling is separated into two consecutive process steps, the advance and ring building. In the past it was not possible to run both processes in parallel. During ring building the machine is stopped, so ring building is associated with a loss of time for the advance. To increase the efficiency of the tunnel excavation process, the machine is equipped with a system for continuous mining. The two process steps can be carried out at the same time, which improves overall performance and reduces project runtime and thereby the cost of the project. The continuous advance increases the total daily advance rate by a factor of up to 1.6 compared to the discontinuous state-of-the-art advance, resulting in a significant reduction in construction time especially for longer tunnels. In addition, higher system performance and utilization increases energy and resource efficiency, so the environmental impact is significantly reduced.
引用
收藏
页码:2560 / 2564
页数:5
相关论文
共 50 条
  • [21] New Developments in Continuous Production of Viscose Textile Thread
    I.P. Baksheev
    P. A. Butyagin
    A. A. Yakobuk
    O. A. Kuzubov
    Fibre Chemistry, 2001, 33 : 150 - 152
  • [22] NEW DEVELOPMENTS IN CONTINUOUS MINING AND MATERIALS HANDLING.
    Rixen, Werner
    Bulk Solids Handling, 1982, 2 (01): : 91 - 95
  • [23] NEW DEVELOPMENTS IN CONTINUOUS OPEN-WIDTH PRETREATMENT
    不详
    AMERICAN DYESTUFF REPORTER, 1977, 66 (06): : 48 - &
  • [24] NEW DEVELOPMENTS IN CONTINUOUS FULL-WIDTH PREPARATION
    不详
    MELLIAND TEXTILBERICHTE INTERNATIONAL TEXTILE REPORTS, 1977, 58 (05): : 422 - 424
  • [25] NEW DEVELOPMENTS IN THE CONTINUOUS CASTING TECHNIQUE IN JAPAN.
    Ni Mansen
    Zhu Wenjia
    Kang T'ieh/Iron and Steel (Peking), 1981, 16 (05): : 68 - 74
  • [26] New developments in the INRS continuous speech recognition system
    Li, Z
    Heon, M
    OShaughnessy, D
    ICSLP 96 - FOURTH INTERNATIONAL CONFERENCE ON SPOKEN LANGUAGE PROCESSING, PROCEEDINGS, VOLS 1-4, 1996, : 2 - 5
  • [27] Layout design specifications of hard-rock TBM cutterheads at maximum cutter penetration and TBM advance
    Farrokh E.
    Arabian Journal of Geosciences, 2021, 14 (19)
  • [28] Quantitative analysis of several influencing factors on TBM advance speed
    Li, Chao
    Tiedemann, J.
    Zhou, Hongwei
    ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 1318 - +
  • [29] Advance numerical simulation of tunneling by using a double shield TBM
    Hasanpour, Rohola
    COMPUTERS AND GEOTECHNICS, 2014, 57 : 37 - 52
  • [30] Effect of TBM Advance in the Structural Response of Segmental Tunnel Lining
    Galvan, Arturo
    Pena, Fernando
    Moreno-Martinez, Jatziri Y.
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2017, 17 (09)