A complex spherical fuzzy CRADIS method based Fine-Kinney framework for occupational risk evaluation in natural gas pipeline construction

被引:23
|
作者
Wang, Weizhong [1 ]
Wang, Yi [1 ]
Fan, Shuyi [1 ]
Han, Xiao [1 ]
Wu, Qun [2 ]
Pamucar, Dragan [3 ]
机构
[1] Anhui Normal Univ, Sch Econ & Management, Wuhu 241002, Anhui, Peoples R China
[2] Southeast Univ, Sch Econ & Management, Nanjing 211189, Jiangsu, Peoples R China
[3] Univ Belgrade, Fac Org Sci, Dept Operat Res & Stat, Belgrade 11000, Serbia
来源
基金
中国国家自然科学基金;
关键词
Pipeline construction; Complex spherical fuzzy set; Risk prioritization; CRADIS method; Fine; -Kinney; MODEL; INFERENCE; AHP;
D O I
10.1016/j.petrol.2022.111246
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Occupational risk evaluation is one of the most indispensable issues in the risk prevention and control process for the natural gas pipeline construction (NGPC) project. The Fine-Kinney model, recognized as an effective occu-pational risk evaluation technique, has limited capability to handle the occupational risk analysis problem under the complex spherical fuzzy (CSF) environment. Accordingly, a synthetical Fine-Kinney framework based on the compromise ranking of alternatives from distance to ideal solution (CRADIS) method is developed to overcome these downsides of occupation risk analysis in the NGPC project within the CSF context. A prioritized weighted average (PWA) operator for complex spherical fuzzy numbers (CSFNs) is incorporated into the group risk evaluation matrix generation process, which can take the priority degrees of experts into account. Then, the extended CRADIS method-based Fine-Kinney framework is generated, in which the Choquet integral for CSFNs is incorporated to reflect the impact of interactive risk factors. Next, the detailed solution procedures of the framework for handling the occupational risk evaluation problem are presented. Finally, the described frame-work is employed as an empirical example of occupational risk analysis for the NGPC project to demonstrate its feasibility in practice. After that, a sensitivity analysis of the parameter is investigated to testify to the stability and rationality of the reported synthetical Fine-Kinney framework. Subsequently, to further display the advan-tages of the developed Fine-Kinney framework, a comparative study is implemented to discuss the evaluation result of occupational risk derived from the proposed framework and those of the existing similar Fine-Kinney frameworks. The analysis results indicate that the occupational risk (attack by human or animal) with the maximum risk priority value (1.000) using the framework is identified as the most serious risk for the NGPC project.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Evaluation of effectiveness of risk-based comprehensive safety training planning in the gas pipeline construction industry
    Jabbari, Mousa
    Yousefpour, Yousef
    Ghaffari, Mohtasham
    Shokuhian, Alireza
    INTERNATIONAL JOURNAL OF OCCUPATIONAL SAFETY AND ERGONOMICS, 2022, 28 (04) : 2468 - 2481
  • [42] A NOVEL FUZZY EVALUATION METHOD OF DRAINAGE GAS RECOVERY EFFECT BASED ON ENTROPY METHOD USING IN NATURAL GAS DEVELOPMENT
    Du, Jingguo
    Li, Zekun
    Liu, Yuanyuan
    Chen, Jian
    Li, Xingtao
    Liu, Qi
    FRESENIUS ENVIRONMENTAL BULLETIN, 2020, 29 (07): : 5497 - 5504
  • [43] Metro construction safety risk assessment based on the fuzzy AHP and the comprehensive evaluation method
    Zheng, Xin
    Ma, Fenghai
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 1243 - 1248
  • [44] An extensible complex spherical fuzzy decision making model based selection framework for the food waste treatment method
    Wang, Weizhong
    Cao, Yushuo
    Deveci, Muhammet
    Wu, Qun
    APPLIED SOFT COMPUTING, 2024, 150
  • [45] A Comprehensive Assessment Method for Safety Risk of Gas Tunnel Construction Based on Fuzzy Bayesian Network
    Qiu, Daohong
    Qu, Cong
    Xue, Yiguo
    Zhou, Binghua
    Li, Xin
    Ma, Xinmin
    Cui, Jiuhua
    POLISH JOURNAL OF ENVIRONMENTAL STUDIES, 2020, 29 (06): : 4269 - 4289
  • [46] The Application of Fuzzy Synthesis Evaluation Method Based on The Analysis Network Process in Construction Project Risk Evaluation
    Yang Kaiyun
    Nie Qingpeng
    Zhang Ruiling
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1936 - +
  • [47] Application of Fuzzy Comprehensive Evaluation Model Based on Variable Fuzzy Set Method in Construction Enterprises' ERP Project Risk Evaluation
    Wu Yunna
    Huang Zhijun
    2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 466 - 471
  • [48] Risk assessment method of gas pipeline networks based on fuzzy analytic hierarchy process and improved coefficient of variation
    Du Y.
    Fu M.
    Duanmu W.
    Hou L.
    Li J.
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 2023, 63 (06): : 941 - 950
  • [49] Prediction method of driving risk in complex environment based on fuzzy comprehensive evaluation model
    Chen X.L.
    Jim G.J.
    Advances in Transportation Studies, 2020, 1 (Special Issue): : 3 - 12
  • [50] Safety inspection system and comprehensive evaluation method for concrete structure of gas pipeline tunnel based on fuzzy mathematics
    Li, Songhui
    Zhang, Yan
    Han, Shasha
    ADVANCES IN MECHANICAL ENGINEERING, 2021, 13 (09)