A complex spherical fuzzy CRADIS method based Fine-Kinney framework for occupational risk evaluation in natural gas pipeline construction

被引:23
|
作者
Wang, Weizhong [1 ]
Wang, Yi [1 ]
Fan, Shuyi [1 ]
Han, Xiao [1 ]
Wu, Qun [2 ]
Pamucar, Dragan [3 ]
机构
[1] Anhui Normal Univ, Sch Econ & Management, Wuhu 241002, Anhui, Peoples R China
[2] Southeast Univ, Sch Econ & Management, Nanjing 211189, Jiangsu, Peoples R China
[3] Univ Belgrade, Fac Org Sci, Dept Operat Res & Stat, Belgrade 11000, Serbia
来源
基金
中国国家自然科学基金;
关键词
Pipeline construction; Complex spherical fuzzy set; Risk prioritization; CRADIS method; Fine; -Kinney; MODEL; INFERENCE; AHP;
D O I
10.1016/j.petrol.2022.111246
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Occupational risk evaluation is one of the most indispensable issues in the risk prevention and control process for the natural gas pipeline construction (NGPC) project. The Fine-Kinney model, recognized as an effective occu-pational risk evaluation technique, has limited capability to handle the occupational risk analysis problem under the complex spherical fuzzy (CSF) environment. Accordingly, a synthetical Fine-Kinney framework based on the compromise ranking of alternatives from distance to ideal solution (CRADIS) method is developed to overcome these downsides of occupation risk analysis in the NGPC project within the CSF context. A prioritized weighted average (PWA) operator for complex spherical fuzzy numbers (CSFNs) is incorporated into the group risk evaluation matrix generation process, which can take the priority degrees of experts into account. Then, the extended CRADIS method-based Fine-Kinney framework is generated, in which the Choquet integral for CSFNs is incorporated to reflect the impact of interactive risk factors. Next, the detailed solution procedures of the framework for handling the occupational risk evaluation problem are presented. Finally, the described frame-work is employed as an empirical example of occupational risk analysis for the NGPC project to demonstrate its feasibility in practice. After that, a sensitivity analysis of the parameter is investigated to testify to the stability and rationality of the reported synthetical Fine-Kinney framework. Subsequently, to further display the advan-tages of the developed Fine-Kinney framework, a comparative study is implemented to discuss the evaluation result of occupational risk derived from the proposed framework and those of the existing similar Fine-Kinney frameworks. The analysis results indicate that the occupational risk (attack by human or animal) with the maximum risk priority value (1.000) using the framework is identified as the most serious risk for the NGPC project.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] Control theory-based fuzzy Fine-Kinney risk assessment for boiler automation system from the maritime autonomous surface ships (MASS) perspective
    Ceylan, Bulut Ozan
    OCEAN ENGINEERING, 2025, 322
  • [22] Implementation of the analytic hierarchy process (AHP) and Fine-Kinney method (FKM) against risk factors to determine the total cost of occupational health and safety precautions in environmental research laboratories
    Guney, Gokce
    Kahraman, Bayram
    INTERNATIONAL JOURNAL OF OCCUPATIONAL SAFETY AND ERGONOMICS, 2022, 28 (04) : 2606 - 2622
  • [23] Analysis for the reliability based design and evaluation method of natural gas pipeline
    Yang, Peng
    Yu, Zhifeng
    Zhao, Dongran
    Zhang, Jinyuan
    Liu, Yuqing
    ADVANCES IN ENERGY SCIENCE AND EQUIPMENT ENGINEERING, 2015, : 111 - 115
  • [24] A Fuzzy Evaluation Method of Construction Project Risk Based on Cooperation
    Gao, Yunli
    Wang, Qingchun
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2802 - 2805
  • [25] A New Approach to the Fine Kinney Method with AHP Based ELECTRE I and Math Model on Risk Assessment for Natural Disasters
    Derse, Onur
    JOURNAL OF GEOGRAPHY-COGRAFYA DERGISI, 2021, (42): : 155 - 164
  • [26] A new evaluation method of dented natural gas pipeline based on ductile damage
    Wu, Ying
    Du, Zhuohong
    Li, Linya
    Tian, Zhongxu
    APPLIED OCEAN RESEARCH, 2023, 135
  • [27] A rule based fuzzy synthetic evaluation method for risk assessment in pipeline transport
    Liu, Yutao
    Hu, Hao
    Zhang, Di
    TRANSPORT, 2014, 29 (04) : 355 - 362
  • [28] A resilience evaluation method of natural gas pipeline system based on uncertainty analysis
    Yang, Zhaoming
    Li, Xueyi
    Xiang, Qi
    He, Qian
    Faber, Michael H.
    Zio, Enrico
    Su, Huai
    Zhang, Jinjun
    PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2023, 177 : 891 - 908
  • [29] Evaluation of Ergonomic Risks for Construction Workers Based on Multicriteria Decision Framework with the Integration of Spherical Fuzzy Set and Alternative Queuing Method
    Tao, Yu
    Hu, Hao
    Xue, Jie
    Zhang, Zhipeng
    Xu, Feng
    SUSTAINABILITY, 2024, 16 (10)
  • [30] The Risk Allocation Method Based on Fuzzy Integrated Evaluation of Construction Projects
    Gao, Yun-li
    Jiang, Lei
    2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 428 - 432