A complex spherical fuzzy CRADIS method based Fine-Kinney framework for occupational risk evaluation in natural gas pipeline construction

被引:23
|
作者
Wang, Weizhong [1 ]
Wang, Yi [1 ]
Fan, Shuyi [1 ]
Han, Xiao [1 ]
Wu, Qun [2 ]
Pamucar, Dragan [3 ]
机构
[1] Anhui Normal Univ, Sch Econ & Management, Wuhu 241002, Anhui, Peoples R China
[2] Southeast Univ, Sch Econ & Management, Nanjing 211189, Jiangsu, Peoples R China
[3] Univ Belgrade, Fac Org Sci, Dept Operat Res & Stat, Belgrade 11000, Serbia
来源
基金
中国国家自然科学基金;
关键词
Pipeline construction; Complex spherical fuzzy set; Risk prioritization; CRADIS method; Fine; -Kinney; MODEL; INFERENCE; AHP;
D O I
10.1016/j.petrol.2022.111246
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Occupational risk evaluation is one of the most indispensable issues in the risk prevention and control process for the natural gas pipeline construction (NGPC) project. The Fine-Kinney model, recognized as an effective occu-pational risk evaluation technique, has limited capability to handle the occupational risk analysis problem under the complex spherical fuzzy (CSF) environment. Accordingly, a synthetical Fine-Kinney framework based on the compromise ranking of alternatives from distance to ideal solution (CRADIS) method is developed to overcome these downsides of occupation risk analysis in the NGPC project within the CSF context. A prioritized weighted average (PWA) operator for complex spherical fuzzy numbers (CSFNs) is incorporated into the group risk evaluation matrix generation process, which can take the priority degrees of experts into account. Then, the extended CRADIS method-based Fine-Kinney framework is generated, in which the Choquet integral for CSFNs is incorporated to reflect the impact of interactive risk factors. Next, the detailed solution procedures of the framework for handling the occupational risk evaluation problem are presented. Finally, the described frame-work is employed as an empirical example of occupational risk analysis for the NGPC project to demonstrate its feasibility in practice. After that, a sensitivity analysis of the parameter is investigated to testify to the stability and rationality of the reported synthetical Fine-Kinney framework. Subsequently, to further display the advan-tages of the developed Fine-Kinney framework, a comparative study is implemented to discuss the evaluation result of occupational risk derived from the proposed framework and those of the existing similar Fine-Kinney frameworks. The analysis results indicate that the occupational risk (attack by human or animal) with the maximum risk priority value (1.000) using the framework is identified as the most serious risk for the NGPC project.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Fine-Kinney method based on fuzzy logic for natural gas pipeline project risk assessment
    Burak Efe
    Ömer Faruk Efe
    Soft Computing, 2023, 27 : 16465 - 16482
  • [2] Fine-Kinney method based on fuzzy logic for natural gas pipeline project risk assessment
    Efe, Burak
    Efe, oemer Faruk
    SOFT COMPUTING, 2023, 27 (22) : 16465 - 16482
  • [3] Fine-Kinney fuzzy-based occupational health risk assessment for Workers in different construction trades
    Li, Hongyang
    Wang, Yousong
    Chong, Dan
    Rajendra, Darmicka
    Skitmore, Martin
    AUTOMATION IN CONSTRUCTION, 2024, 168
  • [4] A Fermatean fuzzy Fine-Kinney for occupational risk evaluation using extensible MARCOS with prospect theory
    Wang, Weizhong
    Han, Xiao
    Ding, Weiping
    Wu, Qun
    Chen, Xiaoqing
    Deveci, Muhammet
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2023, 117
  • [5] A Fermatean fuzzy GLDS approach for ranking potential risk in the Fine-Kinney framework
    Fang, Chang
    Chen, Yu
    Wang, Yi
    Wang, Weizhong
    Yu, Qianping
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2023, 45 (02) : 3149 - 3163
  • [6] Risk assessment with the fuzzy Fine-Kinney method in a business operating in the metal industry
    Ozcelik, Tijen Over
    Yalciner, Ayten Yilmaz
    Cetinkaya, Mehmet
    Aker, Aygul
    INTERNATIONAL JOURNAL OF OCCUPATIONAL SAFETY AND ERGONOMICS, 2025, 31 (01) : 308 - 317
  • [7] Fuzzy rule-based Fine-Kinney risk assessment approach for rail transportation systems
    Gul, Muhammet
    Celik, Erkan
    HUMAN AND ECOLOGICAL RISK ASSESSMENT, 2018, 24 (07): : 1786 - 1812
  • [8] An integrated interval-valued spherical fuzzy Choquet integral based decision making model for prioritizing risk in Fine-Kinney
    Wang, Yi
    Wang, Weizhong
    Deveci, Muhammet
    Yu, Xinyue
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2024, 127
  • [9] An integrated Fine-Kinney risk assessment model utilizing Fermatean fuzzy AHP-WASPAS for occupational hazards in the aquaculture sector
    Ayvaz, Berk
    Tatar, Veysel
    Sag, Zeynep
    Pamucar, Dragan
    PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2024, 186 : 232 - 251
  • [10] A new hybrid risk assessment method based on Fine-Kinney and ANFIS methods for evaluation spatial risks in nursing homes
    Gokler, Seda Hatice
    Yilmaz, Didem
    Uruk, Zerrin Funda
    Boran, Semra
    HELIYON, 2022, 8 (10)