Decision trees in cost-benefit analysis for flood risk management plans

被引:0
|
作者
Napolitano, Jacopo [1 ]
Di Francesco, Massimo [2 ]
Sechi, Giovanni Maria [1 ]
机构
[1] Univ Cagliari, Dept Civil Environm Engn & Architecture, Via Marengo 2, I-09123 Cagliari, Italy
[2] Univ Cagliari, Dept Math & Comp Sci, Via Osped 72, I-09123 Cagliari, Italy
关键词
cost-benefit analysis; decision analysis under uncertainty; decision trees; flood mitigation measures; MODEL;
D O I
10.2166/hydro.2024.194
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
According to the European Directive 2007/60/CE, flood risk evaluation should include a cost-benefit analysis (CBA) on a long-term time horizon to evaluate the impact of mitigation measures. The standard CBA assumes to know in advance the events observed in the time horizon and a priori compares all mitigation measures by an economic metric. No change is supposed to be made to these measures throughout the time horizon. This modus operandi is not appropriate in the domain of flood risk management because several conditions are uncertain when the CBA is made (e.g., urban policies). This article faces these challenges by the integration of cost-benefit analysis and decision trees, to prescribe mitigation measures under uncertainty on the budget for mitigation actions because their funding can be modified after the conclusion of the CBA. The former integration is discussed in the real case of the lowland valley of the Coghinas River (Sardinia, Italy), for which the classical CBA compared five mitigation measures of infrastructural works. The integration into the decision tree also allows to evaluating mitigation measures with changes in infrastructural works and a lamination action. The outcomes advise to decreasing the maximum storage level and increase the peak lamination.
引用
收藏
页码:762 / 778
页数:17
相关论文
共 50 条
  • [1] A Decision Tree for a Cost-Benefit Analysis on Flood Risk Management with Uncertain Funding
    Di Francesco, Massimo
    Napolitano, Jacopo
    Sechi, Giovanni Maria
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS, ICCSA 2021, PT VIII, 2021, 12956 : 513 - 525
  • [2] Social vulnerability in cost-benefit analysis for flood risk management
    Kind, Jarl
    Botzen, W. J. Wouter
    Aerts, Jeroen C. J. H.
    ENVIRONMENT AND DEVELOPMENT ECONOMICS, 2020, 25 (02) : 115 - 134
  • [3] Integrated Cost-Benefit Analysis and Prescriptive Decision Tree Model for a Flood Risk Management Problem
    Napolitano, Jacopo
    di Francesco, Massimo
    Sechi, Giovanni M.
    PROCEEDINGS OF THE 39TH IAHR WORLD CONGRESS, 2022, : 6886 - 6893
  • [4] Accounting for risk aversion, income distribution and social welfare in cost-benefit analysis for flood risk management
    Kind, Jarl
    Botzen, W. J. Wouter
    Aerts, Jeroen C. J. H.
    WILEY INTERDISCIPLINARY REVIEWS-CLIMATE CHANGE, 2017, 8 (02)
  • [5] Cost-Benefit Analysis of the Wuxikou Integrated Flood Management Project Considering the Effects of Flood Risk Reduction and Resettlement
    Peng Zeng
    Weihua Fang
    Haixia Zhang
    Zhongmin Liang
    International Journal of Disaster Risk Science, 2023, 14 (05) : 795 - 812
  • [6] Cost-Benefit Analysis of the Wuxikou Integrated Flood Management Project Considering the Effects of Flood Risk Reduction and Resettlement
    Zeng, Peng
    Fang, Weihua
    Zhang, Haixia
    Liang, Zhongmin
    INTERNATIONAL JOURNAL OF DISASTER RISK SCIENCE, 2023, 14 (5) : 795 - 812
  • [7] Cost-Benefit Analysis of the Wuxikou Integrated Flood Management Project Considering the Effects of Flood Risk Reduction and Resettlement
    Peng Zeng
    Weihua Fang
    Haixia Zhang
    Zhongmin Liang
    International Journal of Disaster Risk Science, 2023, 14 : 795 - 812
  • [8] Approach to a Bayesian decision model for cost-benefit analysis in security risk
    Lichte, D.
    Wolf, K. -D.
    SAFETY AND RELIABILITY - SAFE SOCIETIES IN A CHANGING WORLD, 2018, : 1819 - 1826
  • [9] THE COST-BENEFIT ANALYSIS IN THE MANAGEMENT OF IT PROJECTS
    Melnic, Andreia-Simona
    METALURGIA INTERNATIONAL, 2010, 15 : 66 - 69
  • [10] Cost-Benefit Analysis and Public Project Decision
    Gao, Xizhen
    Li, Yu
    2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 2295 - +