Cost-Benefit Analysis of the Wuxikou Integrated Flood Management Project Considering the Effects of Flood Risk Reduction and Resettlement

被引:0
|
作者
Peng Zeng
Weihua Fang
Haixia Zhang
Zhongmin Liang
机构
[1] Beijing Normal University,Key Laboratory of Environmental Change and Natural Disasters, Ministry of Education
[2] Beijing Normal University,Academy of Disaster Risk Science, Faculty of Geographical Science
[3] Beijing Normal University,State Key Laboratory of Earth Surface Processes and Resource Ecology (ESPRE)
[4] Hohai University,College of Hydrology and Water Resources
关键词
Cost-benefit analysis; Flood management project; Resettlement; Risk reduction;
D O I
暂无
中图分类号
学科分类号
摘要
Evaluation of the economic costs and benefits of flood disaster risk management projects is crucial. However, current cost-benefit analyses (CBA) often lack reliable estimates of the expected loss reduction from flood control measures and ignore quantitative assessments of resettlement. To address these limitations, this study incorporated a probabilistic risk analysis method and quantitative resettlement benefits assessment into the CBA framework, using the Wuxikou Integrated Flood Management Project (WIFMP) in Jiangxi Province, China, as a case study. The direct economic benefits of flood control were estimated by integrating hydrological statistics, numerical flood inundation simulation, and quantitative damage analysis with exposure and vulnerability data. Furthermore, the resettlement benefits were quantified by measuring the annual income growth of migrants based on assumptions about household employment. Our analysis shows that the total WIFMP investment is RMB 3546.1 million yuan (USD 1 = RMB 6.976 yuan), including loan principal and interest of 244.4 million yuan, and operations and maintenance of 605.5 million yuan at 2020 prices. Annual project benefits are estimated at 351.3 million yuan in flood risk reduction, 155.7–191.9 million yuan from increased resettlement income, and 42.7 million yuan in power and water revenues. Considering the costs and benefits across the entire project lifecycle, the internal rate of return ranges from 13.7 to 14.2%, and the net present value ranges from 31.8 to 352.6 billion yuan. Through improved benefit estimation methodology, this research enables a more reliable and holistic evaluation of costs and benefits for flood risk management projects. It provides insights for policymakers and practitioners involved in similar projects, contributing to more informed decision making and better allocation of resources in flood disaster risk management.
引用
收藏
页码:795 / 812
页数:17
相关论文
共 50 条
  • [1] Cost-Benefit Analysis of the Wuxikou Integrated Flood Management Project Considering the Effects of Flood Risk Reduction and Resettlement
    Peng Zeng
    Weihua Fang
    Haixia Zhang
    Zhongmin Liang
    International Journal of Disaster Risk Science, 2023, 14 (05) : 795 - 812
  • [2] Cost-Benefit Analysis of the Wuxikou Integrated Flood Management Project Considering the Effects of Flood Risk Reduction and Resettlement
    Zeng, Peng
    Fang, Weihua
    Zhang, Haixia
    Liang, Zhongmin
    INTERNATIONAL JOURNAL OF DISASTER RISK SCIENCE, 2023, 14 (5) : 795 - 812
  • [3] Social vulnerability in cost-benefit analysis for flood risk management
    Kind, Jarl
    Botzen, W. J. Wouter
    Aerts, Jeroen C. J. H.
    ENVIRONMENT AND DEVELOPMENT ECONOMICS, 2020, 25 (02) : 115 - 134
  • [4] Decision trees in cost-benefit analysis for flood risk management plans
    Napolitano, Jacopo
    Di Francesco, Massimo
    Sechi, Giovanni Maria
    JOURNAL OF HYDROINFORMATICS, 2024, 26 (04) : 762 - 778
  • [5] Integrated Cost-Benefit Analysis and Prescriptive Decision Tree Model for a Flood Risk Management Problem
    Napolitano, Jacopo
    di Francesco, Massimo
    Sechi, Giovanni M.
    PROCEEDINGS OF THE 39TH IAHR WORLD CONGRESS, 2022, : 6886 - 6893
  • [6] A Decision Tree for a Cost-Benefit Analysis on Flood Risk Management with Uncertain Funding
    Di Francesco, Massimo
    Napolitano, Jacopo
    Sechi, Giovanni Maria
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS, ICCSA 2021, PT VIII, 2021, 12956 : 513 - 525
  • [7] Cost-benefit analysis of shrimp farming's flood risk reduction strategies in Thailand
    Seekao, C.
    Pharino, C.
    JOURNAL OF FLOOD RISK MANAGEMENT, 2018, 11 : S805 - S816
  • [8] The use of equivalent annual cost for cost-benefit analyses in flood risk reduction strategies
    Schoemaker, M. A.
    Verlaan, J. G.
    Vos, R.
    Kok, M.
    3RD EUROPEAN CONFERENCE ON FLOOD RISK MANAGEMENT (FLOODRISK 2016), 2016, 7
  • [9] Accounting for risk aversion, income distribution and social welfare in cost-benefit analysis for flood risk management
    Kind, Jarl
    Botzen, W. J. Wouter
    Aerts, Jeroen C. J. H.
    WILEY INTERDISCIPLINARY REVIEWS-CLIMATE CHANGE, 2017, 8 (02)
  • [10] Incorporation of Cost-Benefit Analysis Considering Epistemic Uncertainty for Calculating the Optimal Design Flood
    Kim, Sang Ug
    Lee, Cheol-Eung
    WATER RESOURCES MANAGEMENT, 2021, 35 (02) : 757 - 774