Decision trees in cost-benefit analysis for flood risk management plans

被引:0
|
作者
Napolitano, Jacopo [1 ]
Di Francesco, Massimo [2 ]
Sechi, Giovanni Maria [1 ]
机构
[1] Univ Cagliari, Dept Civil Environm Engn & Architecture, Via Marengo 2, I-09123 Cagliari, Italy
[2] Univ Cagliari, Dept Math & Comp Sci, Via Osped 72, I-09123 Cagliari, Italy
关键词
cost-benefit analysis; decision analysis under uncertainty; decision trees; flood mitigation measures; MODEL;
D O I
10.2166/hydro.2024.194
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
According to the European Directive 2007/60/CE, flood risk evaluation should include a cost-benefit analysis (CBA) on a long-term time horizon to evaluate the impact of mitigation measures. The standard CBA assumes to know in advance the events observed in the time horizon and a priori compares all mitigation measures by an economic metric. No change is supposed to be made to these measures throughout the time horizon. This modus operandi is not appropriate in the domain of flood risk management because several conditions are uncertain when the CBA is made (e.g., urban policies). This article faces these challenges by the integration of cost-benefit analysis and decision trees, to prescribe mitigation measures under uncertainty on the budget for mitigation actions because their funding can be modified after the conclusion of the CBA. The former integration is discussed in the real case of the lowland valley of the Coghinas River (Sardinia, Italy), for which the classical CBA compared five mitigation measures of infrastructural works. The integration into the decision tree also allows to evaluating mitigation measures with changes in infrastructural works and a lamination action. The outcomes advise to decreasing the maximum storage level and increase the peak lamination.
引用
收藏
页码:762 / 778
页数:17
相关论文
共 50 条
  • [31] A place for cost-benefit analysis (Decision-making, choice)
    Schmidtz, D
    NOUS, 2001, : 148 - 171
  • [32] Survey and Cost-Benefit Analysis of Camellia brevistyla Management
    Lin, Jiunn-Cheng
    Chen, Yi-Hung
    Wang, Pei-Jung
    Wu, Meng-Shan
    Taiwan Journal of Forest Science, 2019, 34 (01): : 1 - 11
  • [33] COST-BENEFIT ANALYSIS - PART OF A KNOWELDGE MANAGEMENT SYSTEM
    Grecu, Iulia
    Grigore, Manuela
    QUALITY AND EFFICIENCY IN E-LEARNING, VOL 1, 2013, : 422 - 431
  • [34] COST-BENEFIT AND PROCEDURE BENEFIT ANALYSIS OF INFANTS AT RISK FOR OCCULT BACTEREMIA
    STEPHAN, M
    BAKER, RC
    BAUSHER, JC
    AMERICAN JOURNAL OF DISEASES OF CHILDREN, 1990, 144 (04): : 422 - 422
  • [35] DECISION SUPPORT SYSTEM FOR COST-BENEFIT ANALYSIS IN SERVICE PROVISION
    Livani, Emadoddin
    Paikari, Elham
    Ruhe, Gunther
    ICEIS 2011: PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS, VOL 2, 2011, : 198 - 203
  • [36] Surviving in a Cosexual World: A Cost-Benefit Analysis of Dioecy in Tropical Trees
    Bruijning, Marjolein
    Visser, Marco D.
    Muller-Landau, Helene C.
    Wright, S. Joseph
    Comita, Liza S.
    Hubbell, Stephen P.
    de Kroon, Hans
    Jongejans, Eelke
    AMERICAN NATURALIST, 2017, 189 (03): : 297 - 314
  • [37] Cost-Benefit Analysis and Risk in Socioeconomic Evaluation of Projects
    Sieber, Patrik
    Hnilica, Jiri
    EKONOMICKY CASOPIS, 2011, 59 (07): : 669 - 683
  • [38] Cost-Benefit Analysis of Urban Fire Stations Management
    Kang Canhua
    Wu Wei
    Yan Xi
    E-BUSINESS, MANAGEMENT AND ECONOMICS, 2011, 3 : 56 - +
  • [39] A cost-benefit analysis of removing alien trees in the Tsitsikamma mountain catchment
    Hosking, SG
    du Preez, M
    SOUTH AFRICAN JOURNAL OF SCIENCE, 1999, 95 (10) : 442 - 448
  • [40] RISK-BENEFIT AND COST-BENEFIT METHODOLOGY
    EICHHOLZ, GG
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1975, 22 (NOV16): : 83 - 84