Modeling and Optimization of Parallel Disassembly Line Balancing Problem With Parallel Workstations

被引:0
|
作者
Liang, Wei [1 ]
Zhang, Zeqiang [1 ]
Zeng, Yanqing [1 ]
Yin, Tao [1 ]
Wu, Tengfei [1 ]
机构
[1] Southwest Jiaotong Univ, Sch Mech Engn, Technol & Equipment Rail Transit Operat & Mainten, Chengdu 610031, Peoples R China
基金
中国国家自然科学基金;
关键词
Mixed-integer nonlinear programming (MINLP); multiobjective enhanced differential evolution algorithm (MEDE); parallel disassembly line balancing; parallel workstations; ALGORITHM;
D O I
10.1109/TII.2023.3241583
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
To reasonably arrange disassembly facilities and plan enterprise space, we propose a parallel disassembly line balancing problem (PW-PDLBP) with parallel workstations. Additionally, a mixed-integer nonlinear programming (MINLP) model that minimizes the line length, number of workstations, idle time balancing index, and energy consumption is established based on the problem characteristics and is solved using the GUROBI optimizer. Furthermore, a multiobjective enhanced differential evolution algorithm (MEDE) is developed to obtain high-quality disassembly schemes for PW-PDLBP. The correctness of encoding and decoding and the solving performance of MEDE are verified by comparing with the MINLP model and four existing algorithms. Then, an instance consisting of two different types of end-of-life TVs is optimized. Finally, the effectiveness of PW-PDLBP in improving enterprise space utilization is validated by comparing it with the parallel line layout without parallel workstations.
引用
收藏
页码:10684 / 10692
页数:9
相关论文
共 50 条
  • [31] Modelling and optimisation of energy consumption and profit-oriented multi-parallel partial disassembly line balancing problem
    Liang, Wei
    Zhang, Zeqiang
    Yin, Tao
    Zhang, Yu
    Wu, Tengfei
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2023, 262
  • [32] A survey of the literature on the multiple or parallel assembly line balancing problem
    Lusa, Amaia
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2008, 2 (01) : 50 - 72
  • [33] A Tabu Search Algorithm for the Parallel Assembly Line Balancing Problem
    Ozcan, Ugur
    Cercioglu, Hakan
    Gokcen, Hadi
    Toklu, Bilal
    GAZI UNIVERSITY JOURNAL OF SCIENCE, 2009, 22 (04): : 313 - 323
  • [34] A line balancing problem with parallel workers and cycle time minimization
    Melega, Gislaine Mara
    Belgarch, Sanae
    Jans, Raf
    Paquette, Julie
    INFOR, 2024,
  • [35] A SIMULATED ANNEALING APPROACH FOR PARALLEL ASSEMBLY LINE BALANCING PROBLEM
    Cercioglu, Hakan
    Ozcan, Ugur
    Gokcen, Hadi
    Toklu, Bilal
    JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2009, 24 (02): : 331 - 341
  • [36] A Salp Swarm Algorithm for Parallel Disassembly Line Balancing Considering Workers With Government Benefits
    Qin, Shujin
    Li, Jiawei
    Wang, Jiacun
    Guo, Xiwang
    Liu, Shixin
    Qi, Liang
    IEEE TRANSACTIONS ON COMPUTATIONAL SOCIAL SYSTEMS, 2024, 11 (01) : 282 - 291
  • [37] Heuristic and metaheuristic procedures for the buffer sizing problem in parallel assembly lines balancing problem with multi-line workstations and different cycle times
    Aguilar, Harry
    Garcia-Villoria, Alberto
    Pastor, Rafael
    COMPUTERS & OPERATIONS RESEARCH, 2023, 157
  • [38] PARALLEL STRUCTURAL OPTIMIZATION ON A NETWORK OF COMPUTER WORKSTATIONS
    SIKIOTIS, ES
    SAOUMA, VE
    COMPUTERS & STRUCTURES, 1988, 29 (01) : 141 - 150
  • [39] PCL - A LANGUAGE FOR PARALLEL OPTIMIZATION ON DISTRIBUTED WORKSTATIONS
    FROMMBERGER, M
    BRUGGEMANN, F
    GRAUER, M
    LECTURE NOTES IN ECONOMICS AND MATHEMATICAL SYSTEMS, 1991, 367 : 115 - 132
  • [40] Ant colony optimization for sequence-dependent disassembly line balancing problem
    Kalayci, Can B.
    Gupta, Surendra M.
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2013, 24 (03) : 413 - 427