Robust counterpart mathematical models for balancing, sequencing, and assignment of robotic U-shaped assembly lines with considering failures and setup times

被引:3
|
作者
Samouei, Parvaneh [1 ]
Sobhishoja, Mahsa [1 ]
机构
[1] Bu Ali Sina Univ, Fac Engn, Dept Ind Engn, Hamadan, Hamadan, Iran
关键词
Metaheuristics; Robotic U-shaped mixed-model assembly line; Harmony search algorithm; NSGA-II; Preventive maintenance; Robust optimization; Sequence-dependent setup time; HARMONY SEARCH; HEURISTIC ALGORITHM; WORKER ASSIGNMENT; SCHEDULING TASKS; OPTIMIZATION;
D O I
10.1007/s12597-022-00609-w
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In recent years, robots have been widely used in assembly systems called robotic assembly lines, where a set of tasks have to be assigned to stations, and each station needs to select one of the different robots to process the assigned tasks. Our focus is on U-shaped layouts because they are widely employed in many industries due to their efficiency and flexibility compared to straight assembly lines. These lines offer more choices to group operations. A worker can be assigned to multiple stations at the entrance and the exit sides. Moreover, it has been shown experimentally that labor productivity can increase significantly in U-shaped lines. However, in many realistic situations, robots may be unavailable during the scheduling horizon for different reasons, such as breakdowns. This research deals with line balancing under uncertainty. It presents robust optimization models for balancing, sequencing, and robot assignment of U-shaped assembly lines with considering sequencing-dependent setup times, failure robots, and preventive maintenance. The nature of this problem is NP-hard with two objective functions; a multi-objective harmony search is suggested to solve it. The parameters of the proposed algorithm were analyzed using the Taguchi method, and their results were compared with the non-dominated sorting genetic algorithm-II (NSGA-II).
引用
收藏
页码:87 / 124
页数:38
相关论文
共 50 条
  • [31] Mixed-model U-shaped assembly lines: Balancing and comparing with straight lines with buffers and parallel workstations
    Tiacci, Lorenzo
    JOURNAL OF MANUFACTURING SYSTEMS, 2017, 45 : 286 - 305
  • [32] Application of Particle Swarm Optimization to Maximize Efficiency of Straight and U-Shaped Robotic Assembly Lines
    Janardhanan, Mukund Nilakantan
    Nielsen, Peter
    Ponnambalam, S. G.
    DISTRIBUTED COMPUTING AND ARTIFICIAL INTELLIGENCE, (DCAI 2016), 2016, 474 : 525 - 533
  • [33] Dynamic Balancing of U-Shaped Robotic Disassembly Lines Using an Effective Deep Reinforcement Learning Approach
    Wang, Kaipu
    Li, Yibing
    Guo, Jun
    Gao, Liang
    Li, Xinyu
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2024, 20 (04) : 6855 - 6865
  • [34] Modified genetic algorithm for simple straight and U-shaped assembly line balancing with fuzzy processing times
    Alavidoost, M. H.
    Zarandi, M. H. Fazel
    Tarimoradi, Mosahar
    Nemati, Yaser
    JOURNAL OF INTELLIGENT MANUFACTURING, 2017, 28 (02) : 313 - 336
  • [35] Modified genetic algorithm for simple straight and U-shaped assembly line balancing with fuzzy processing times
    M. H. Alavidoost
    M. H. Fazel Zarandi
    Mosahar Tarimoradi
    Yaser Nemati
    Journal of Intelligent Manufacturing, 2017, 28 : 313 - 336
  • [36] Balancing and sequencing of mixed-model parallel robotic assembly lines considering energy consumption
    Soysal-Kurt, Halenur
    Isleyen, Selcuk Kursat
    Gokcen, Hadi
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2024, 37 (1) : 38 - 66
  • [37] Mathematical model and grey wolf optimization for low-carbon and low-noise U-shaped robotic assembly line balancing problem
    Zhang, Zikai
    Tang, Qiuhua
    Zhang, Liping
    JOURNAL OF CLEANER PRODUCTION, 2019, 215 : 744 - 756
  • [38] Balancing of mixed-model two-sided assembly lines with multiple U-shaped layout
    Rabbani, Masoud
    Moghaddam, Mohsen
    Manavizadeh, Neda
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 59 (9-12): : 1191 - 1210
  • [39] Balancing of mixed-model two-sided assembly lines with multiple U-shaped layout
    Masoud Rabbani
    Mohsen Moghaddam
    Neda Manavizadeh
    The International Journal of Advanced Manufacturing Technology, 2012, 59 : 1191 - 1210
  • [40] Using parallel metaheuristics to solve a parallel U-shaped robotic mixed-model assembly line balancing and sequencing problem: Using parallel metaheuristics to solve a parallel U-shaped robotic mixed-model…: Azadeh Farsi et al.
    Farsi, Azadeh
    Mokhtarzadeh, Mahdi
    Rabbani, Masoud
    Manavizadeh, Neda
    Ghasempour Anaraki, Matin
    Soft Computing, 28 (21) : 12603 - 12621