Using parallel metaheuristics to solve a parallel U-shaped robotic mixed-model assembly line balancing and sequencing problem: Using parallel metaheuristics to solve a parallel U-shaped robotic mixed-model…: Azadeh Farsi et al.

被引:0
|
作者
Farsi, Azadeh [1 ]
Mokhtarzadeh, Mahdi [2 ,3 ]
Rabbani, Masoud [3 ]
Manavizadeh, Neda [4 ]
Ghasempour Anaraki, Matin [3 ]
机构
[1] Department of Systems and Industrial Engineering, University of Arizona, Tucson,AZ, United States
[2] Department of Industrial Systems Engineering and Product Design, Ghent University, Ghent, Belgium
[3] School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
[4] Department of Industrial Engineering, KHATAM Institute of Higher Education, Tehran, Iran
关键词
Compendex;
D O I
10.1007/s00500-024-10311-2
中图分类号
学科分类号
摘要
Robotic assembly
引用
收藏
页码:12603 / 12621
页数:18
相关论文
共 42 条
  • [1] Balancing of mixed-model parallel U-shaped assembly lines considering model sequences
    Kucukkoc, Ibrahim
    Zhang, David Z.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (20) : 5958 - 5975
  • [2] Mixed-model U-shaped assembly lines: Balancing and comparing with straight lines with buffers and parallel workstations
    Tiacci, Lorenzo
    JOURNAL OF MANUFACTURING SYSTEMS, 2017, 45 : 286 - 305
  • [3] Balancing and sequencing problem of mixed-model U-shaped robotic assembly line: Mathematical model and dragonfly algorithm based approach
    Zhang, Beikun
    Xu, Liyun
    Zhang, Jian
    APPLIED SOFT COMPUTING, 2021, 98
  • [4] Simulation-based Assembly Line Balancing in U-shaped, Parallel U-shaped, and Parallel Adjacent U-shaped Layouts
    Doung, P.
    Sirovetnukul, R.
    Ren, J.
    2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 751 - 755
  • [5] Mathematical model and metaheuristics for simultaneous balancing and sequencing of a robotic mixed-model assembly line
    Li, Zixiang
    Janardhanan, Mukund Nilakantan
    Tang, Qiuhua
    Nielsen, Peter
    ENGINEERING OPTIMIZATION, 2018, 50 (05) : 877 - 893
  • [6] A novel two-stage framework for reducing ergonomic risks of a mixed-model parallel U-shaped assembly-line
    Mokhtarzadeh, Mahdi
    Rabbani, Masoud
    Manavizadeh, Neda
    APPLIED MATHEMATICAL MODELLING, 2021, 93 : 597 - 617
  • [7] Balancing and Scheduling Mixed-Model U-Shaped Production Lines
    John Miltenburg
    International Journal of Flexible Manufacturing Systems, 2002, 14 (2): : 119 - 151
  • [8] Balancing and sequencing of parallel mixed-model assembly lines
    Ozcan, Ugur
    Cercioglu, Hakan
    Gokcen, Hadi
    Toklu, Bilal
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (17) : 5089 - 5113
  • [9] Balancing and scheduling mixed-model U-shaped production lines
    Miltenburg, J
    INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 2002, 14 (02): : 123 - 155
  • [10] Balancing and sequencing of mixed-model parallel robotic assembly lines considering energy consumption
    Soysal-Kurt, Halenur
    Isleyen, Selcuk Kursat
    Gokcen, Hadi
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2024, 37 (1) : 38 - 66