Evaluation system of worker comfort for high geothermal tunnel during construction: A case study on the highway tunnel with the highest temperature in China

被引:23
|
作者
Zhou, Ping [1 ]
Feng, Yang [2 ]
Zhou, Feicong [2 ]
Wei, Ziqi [2 ]
Gou, Sanjiang [3 ]
Xu, Hongbin [4 ]
Wang, Zhijie [2 ]
机构
[1] Southwest Jiaotong Univ, Fac Geosci & Environm Engn, Chengdu 611756, Sichuan, Peoples R China
[2] Southwest Jiaotong Univ, Sch Civil Engn, Chengdu 610031, Sichuan, Peoples R China
[3] Sinohydro Bur 5 Co Ltd, Chengdu 610065, Sichuan, Peoples R China
[4] Shenzhen Univ, Inst Urban Smart Transportat & Safety Maintenance, Shenzhen 518060, Peoples R China
基金
中国国家自然科学基金;
关键词
High geothermal tunnel; Analytic Hierarchy Process(AHP); Extenics theory; Comfort evaluation; Worker protection; THERMAL COMFORT;
D O I
10.1016/j.tust.2023.105028
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Geothermal environment is easily formed due to alternating uplift or subsidence of continental plates in the world. In this special environment, tunnel engineering activities will inevitably encounter the problems of high temperature and thermal damage. In the construction process of high geothermal tunnel, high temperature has a great impact on the comfort of workers. This paper is based on the extra-long highway tunnel with the highest temperature of 88.8 degrees C in China. Through literature research, field monitoring, numerical simulation, theoretical calculation and other means, this paper investigates evaluation system of worker comfort during construction in high geothermal and deep buried tunnel. The comfort of workers is mainly affected by geological conditions, construction conditions, geographical environment conditions and thermal insulation and cooling measures, including 19 impact indicators, such as rock temperature, buried depth, excavation method, thermal insulation layer, ice block, ventilation. Based on the impact indicators, the AHP-Extenics evaluation system is established for worker comfort. The results show that the worker comfort level is level I in Nige Tunnel after adopting thermal insulation and cooling measures. On the whole, the worker can work comfortably. Finally, based on the AHP-Extenics evaluation system, a design process of worker protection is established to ensure that the comfort level of worker meets the requirements.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Pretreatment for Tunnel Karst Cave during Excavation: A Case Study of Guangxi, China
    Li, Junjie
    Chen, Qiunan
    Huang, Xiaocheng
    Zou, Gen
    Deng, Jiazheng
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [42] In-tunnel pollutant concentration measurement and ventilation control indexes for highway tunnels in mountainous area: A case study of no.1 Qinling tunnel, China
    Chen, Jianxun
    Luo, Yanbin
    Fang, Tengfei
    Zhang, Xinyu
    Liu, Weiwei
    Wang, Chuanwu
    Science of the Total Environment, 2024, 955
  • [43] A Study on Temperature Distribution of Surrounding Rock and Mechanical Characteristics of Lining of Monglian Tunnel under High Geothermal
    Liang, Bo
    Zhao, Ningyu
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 2594 - 2600
  • [44] Development and application of a new ballast water system for immersed tunnel installation: A case study of the Yuliangzhou tunnel in Xiangyang, China
    Zhou, Xingtao
    Sun, Xiaowei
    Jiao, Yu-yong
    Zeng, Bocun
    Tan, Fei
    Li, Tao
    Wei, Pengfei
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 119
  • [45] Monitoring and Evaluation of Artificial Ground Freezing in Metro Tunnel Construction-A Case Study
    Yan, Qixiang
    Wu, Wang
    Zhang, Chuan
    Ma, Shuqi
    Li, Yuanping
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (05) : 2359 - 2370
  • [46] Evaluation of internal environmental pollution in non-blasting tunnel construction and case study
    Sun, Jianchun
    Yang, Shiyong
    Huang, Shengping
    Shang, Zhijiang
    Ling, Weihao
    KYBERNETES, 2025,
  • [47] Monitoring and Evaluation of Artificial Ground Freezing in Metro Tunnel Construction-A Case Study
    Qixiang Yan
    Wang Wu
    Chuan Zhang
    Shuqi Ma
    Yuanping Li
    KSCE Journal of Civil Engineering, 2019, 23 : 2359 - 2370
  • [48] Study on Air Cabin Ventilation System by Local Structural Optimization during Tunnel Construction
    Yang, Shuai
    Ren, Rui
    Wang, Ya-Qiong
    BUILDINGS, 2022, 12 (12)
  • [49] A Case Study of Tunnel Reinforcement Measure during Traffic Upgrading in Chongqing City, China
    Cai Z.
    Wu T.
    Zhang H.
    Liu J.
    Xiang Z.
    Tao Y.
    Feng X.
    Mathematical Problems in Engineering, 2024, 2024
  • [50] Ambient temperature prediction model and cooling requirement analyze in the high-altitude construction tunnel passing through the abnormally high geothermal region
    Wang, Yan
    Zhou, Xiaohan
    Liu, Xinrong
    Chen, Xin
    Xu, Qiang
    Wang, Qunli
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 141