Evaluation system of worker comfort for high geothermal tunnel during construction: A case study on the highway tunnel with the highest temperature in China

被引:23
|
作者
Zhou, Ping [1 ]
Feng, Yang [2 ]
Zhou, Feicong [2 ]
Wei, Ziqi [2 ]
Gou, Sanjiang [3 ]
Xu, Hongbin [4 ]
Wang, Zhijie [2 ]
机构
[1] Southwest Jiaotong Univ, Fac Geosci & Environm Engn, Chengdu 611756, Sichuan, Peoples R China
[2] Southwest Jiaotong Univ, Sch Civil Engn, Chengdu 610031, Sichuan, Peoples R China
[3] Sinohydro Bur 5 Co Ltd, Chengdu 610065, Sichuan, Peoples R China
[4] Shenzhen Univ, Inst Urban Smart Transportat & Safety Maintenance, Shenzhen 518060, Peoples R China
基金
中国国家自然科学基金;
关键词
High geothermal tunnel; Analytic Hierarchy Process(AHP); Extenics theory; Comfort evaluation; Worker protection; THERMAL COMFORT;
D O I
10.1016/j.tust.2023.105028
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Geothermal environment is easily formed due to alternating uplift or subsidence of continental plates in the world. In this special environment, tunnel engineering activities will inevitably encounter the problems of high temperature and thermal damage. In the construction process of high geothermal tunnel, high temperature has a great impact on the comfort of workers. This paper is based on the extra-long highway tunnel with the highest temperature of 88.8 degrees C in China. Through literature research, field monitoring, numerical simulation, theoretical calculation and other means, this paper investigates evaluation system of worker comfort during construction in high geothermal and deep buried tunnel. The comfort of workers is mainly affected by geological conditions, construction conditions, geographical environment conditions and thermal insulation and cooling measures, including 19 impact indicators, such as rock temperature, buried depth, excavation method, thermal insulation layer, ice block, ventilation. Based on the impact indicators, the AHP-Extenics evaluation system is established for worker comfort. The results show that the worker comfort level is level I in Nige Tunnel after adopting thermal insulation and cooling measures. On the whole, the worker can work comfortably. Finally, based on the AHP-Extenics evaluation system, a design process of worker protection is established to ensure that the comfort level of worker meets the requirements.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] Research on ventilation cooling design driven by human thermal response in high geothermal temperature tunnel construction
    Hu, Yunpeng
    Zhang, Weiwei
    Wang, Mingnian
    Dong, Yucang
    Chen, Chunrong
    Zhu, Yongquan
    Zhu, Dongping
    CASE STUDIES IN THERMAL ENGINEERING, 2024, 61
  • [22] Evaluation model for immersed tunnel health state: A case study of Honggu Tunnel, Jiangxi Province, China
    Xu, Xiangchun
    Tong, Liyuan
    Liu, Songyu
    Li, Hongjiang
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 90 : 239 - 248
  • [23] Damage management and safety evaluation for operating highway tunnels: a case study of Liupanshan tunnel
    Ye, Fei
    Han, Xin
    Qin, Nan
    Ouyang, Aohui
    Liang, Xing
    Xu, Changxin
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2020, 16 (11) : 1512 - 1523
  • [24] Study on haulage system's safety of highway tunnel construction by using fuzzy comprehensive judgment
    Wang, XQ
    Liu, H
    Dong, YX
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL V, PTS A AND B, 2005, 5 : 848 - 851
  • [25] Thermal pressure ventilation analysis in a sloping high-temperature tunnel: A case study in China
    Che, Jigang
    Li, Angui
    Ma, Yuanqing
    Guo, Jinnan
    Li, Jiaxing
    Yang, Changqing
    Che, Lunfei
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2025, 155
  • [26] Rock mass classification in highway tunnel engineering during exploration phase and case study
    Du, Yanqiang
    Xie, Bing
    ARCHIVES OF CIVIL ENGINEERING, 2023, 69 (02) : 141 - 153
  • [27] Study on temperature field and influencing factors of the high geothermal tunnel with extra-long one-end construction ventilation
    Chen, Xin
    Zhou, Xiaohan
    Zhong, Zuliang
    Liang, Ninghui
    Wang, Yan
    Zhang, Xinyuan
    INTERNATIONAL JOURNAL OF THERMAL SCIENCES, 2023, 191
  • [28] UTILIZATION OF BIM IN THE CONSTRUCTION OF A SUBMARINE TUNNEL: A CASE STUDY IN XIAMEN CITY, CHINA
    Li, Sai
    Zhang, Zhongjian
    Mei, Gang
    Lin, Daming
    Yu, Jin
    Qiu, Renke
    Su, Xingju
    Lin, Xuechun
    Lou, Chonghua
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2021, 27 (01) : 14 - 26
  • [29] Evaluation of Geological Model in Construction Process of Sabzkuh Tunnel (Case Study in Iran)
    Taromi, Majid
    Eftekhari, Abbas
    Hamidi, Jafar Khademi
    ENGINEERING GEOLOGY FOR SOCIETY AND TERRITORY, VOL 6: APPLIED GEOLOGY FOR MAJOR ENGINEERING PROJECTS, 2015, : 599 - 610
  • [30] Thermal and humidity control in high-geothermal tunnel by natural ventilation during operational transition period: A case study
    Leng, Ziyu
    Cao, Xiaoling
    Yuan, Yanping
    CASE STUDIES IN THERMAL ENGINEERING, 2025, 65